Perancangan Arsitektur Sistem Informasi Menggunakan Metode Agile Dengan Kerangka Kerja Scrum Pada Pelayanan Instalasi Gizi RSUD. Ciamis

Maulana Sidiq, Rian Dwicahya Supriatman, Eryan Ahmad Firdaus, Bacilius Agung Suburdjati
{"title":"Perancangan Arsitektur Sistem Informasi Menggunakan Metode Agile Dengan Kerangka Kerja Scrum Pada Pelayanan Instalasi Gizi RSUD. Ciamis","authors":"Maulana Sidiq, Rian Dwicahya Supriatman, Eryan Ahmad Firdaus, Bacilius Agung Suburdjati","doi":"10.25134/ilkom.v18i1.52","DOIUrl":null,"url":null,"abstract":"A hospital nutrition service is an inseparable part of other health services in hospitals, besides that nutrition service is an effort to improve the quality of health services for inpatients or outpatients in hospitals. In implementing the Scrum work frame in the architectural design of the nutrition service information system at the Regional Public Hospital Ciamis (RSUD. Ciamis) it is expected to produce products that are in accordance with the client's needs. The stages from preparation (Initialization), making a product backlog, making a sprint backlog to the execution stage of this method indicate an iterative method because it prioritizes product functions. The Scrum framework implements work functions according to its role, namely the Product Owner who is fully responsible for the products that it produces, the Development team is responsible for project work, and the Scrum master is the person who controls so that the implementation of the work does not go out of the rules of the Scrum game. The results of designing an information system with application development, this research uses the scrum framework which is carried out with 3 sprints with the estimated processing time for each sprint as follows: sprint 1 reaches 30 days, sprint 2 reaches 27 days and sprint 3 reaches 30 days. According to the rules of the scrum framework, each sprint should not exceed one month so that the project can be implemented quickly and produce the desired results","PeriodicalId":214195,"journal":{"name":"NUANSA INFORMATIKA","volume":"90 7","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"NUANSA INFORMATIKA","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25134/ilkom.v18i1.52","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A hospital nutrition service is an inseparable part of other health services in hospitals, besides that nutrition service is an effort to improve the quality of health services for inpatients or outpatients in hospitals. In implementing the Scrum work frame in the architectural design of the nutrition service information system at the Regional Public Hospital Ciamis (RSUD. Ciamis) it is expected to produce products that are in accordance with the client's needs. The stages from preparation (Initialization), making a product backlog, making a sprint backlog to the execution stage of this method indicate an iterative method because it prioritizes product functions. The Scrum framework implements work functions according to its role, namely the Product Owner who is fully responsible for the products that it produces, the Development team is responsible for project work, and the Scrum master is the person who controls so that the implementation of the work does not go out of the rules of the Scrum game. The results of designing an information system with application development, this research uses the scrum framework which is carried out with 3 sprints with the estimated processing time for each sprint as follows: sprint 1 reaches 30 days, sprint 2 reaches 27 days and sprint 3 reaches 30 days. According to the rules of the scrum framework, each sprint should not exceed one month so that the project can be implemented quickly and produce the desired results
在 RSUD 的营养安装服务中使用 Scrum 框架的敏捷方法设计信息系统架构。Ciamis
医院营养服务是医院其他医疗服务不可分割的一部分,此外,营养服务也是提高医院住院或门诊病人医疗服务质量的一项工作。在西亚米斯地区公立医院(RSUD.Ciamis)营养服务信息系统的架构设计中实施 Scrum 工作框架时,希望能生产出符合客户需求的产品。这种方法从准备(初始化)、制定产品积压、制定冲刺积压到执行阶段的各个阶段都表明这是一种迭代方法,因为它对产品功能进行了优先排序。Scrum 框架根据其角色来执行工作职能,即产品负责人对其生产的产品负全责,开发团队负责项目工作,Scrum 主控人负责控制,使工作的执行不脱离 Scrum 游戏规则。本研究使用了 Scrum 框架,以 3 个冲刺来完成信息系统的应用开发设计,每个冲刺的预计处理时间如下:冲刺 1 为 30 天,冲刺 2 为 27 天,冲刺 3 为 30 天。根据 scrum 框架的规则,每个冲刺不应超过一个月,以便项目能够快速实施并产生预期结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信