Study Of Work Order Variation And Its Influence On Project Performance In Terms Of Cost And Implementation Time In The Tenjoresmi Area Arrangement Project

Ana Yuni Martanti, T. Kasih, Frans Himawan Tanojo
{"title":"Study Of Work Order Variation And Its Influence On Project Performance In Terms Of Cost And Implementation Time In The Tenjoresmi Area Arrangement Project","authors":"Ana Yuni Martanti, T. Kasih, Frans Himawan Tanojo","doi":"10.46799/ajesh.v3i2.250","DOIUrl":null,"url":null,"abstract":"This research highlights the impact of Variation Orders in construction projects, especially in the Tenjoresmi Area Arrangement. The results of the field study showed that the Variation Order caused significant changes to the Cost Budget Plan (RAB) and the performance of the implementing contractor. Some of the work affected includes changing the brand of air conditioner, replacing the amphitheater with a jogging track, dismantling railings, sanitary dismantling, plumbing dismantling, air conditioning dismantling, removing demolition debris, glass window frames, reinstalling aluminum door and window frames, wall handrails, doors. iron, disposing of excavated gravel, and planting shrubs. RAB analysis revealed changes in cost proportions for various works, such as increases in demolition and architecture and decreases in structures. In October and November, there was a delay in implementing the work due to a contract addendum, which was only approved in mid-October. However, the implementing contractor did not experience financial problems, and even experienced an increase in profit of 0.79%. In conclusion, Variation Orders can affect project time and costs, but flexible contractors can manage them well, and even optimize profits. Effective management is needed to cope with change and ensure the smooth implementation of construction projects.","PeriodicalId":505426,"journal":{"name":"Asian Journal of Engineering, Social and Health","volume":"271 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Asian Journal of Engineering, Social and Health","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46799/ajesh.v3i2.250","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This research highlights the impact of Variation Orders in construction projects, especially in the Tenjoresmi Area Arrangement. The results of the field study showed that the Variation Order caused significant changes to the Cost Budget Plan (RAB) and the performance of the implementing contractor. Some of the work affected includes changing the brand of air conditioner, replacing the amphitheater with a jogging track, dismantling railings, sanitary dismantling, plumbing dismantling, air conditioning dismantling, removing demolition debris, glass window frames, reinstalling aluminum door and window frames, wall handrails, doors. iron, disposing of excavated gravel, and planting shrubs. RAB analysis revealed changes in cost proportions for various works, such as increases in demolition and architecture and decreases in structures. In October and November, there was a delay in implementing the work due to a contract addendum, which was only approved in mid-October. However, the implementing contractor did not experience financial problems, and even experienced an increase in profit of 0.79%. In conclusion, Variation Orders can affect project time and costs, but flexible contractors can manage them well, and even optimize profits. Effective management is needed to cope with change and ensure the smooth implementation of construction projects.
研究 Tenjoresmi 地区安排项目中的工单变更及其对成本和实施时间方面的项目绩效的影响
本研究强调了变更单在建筑项目中的影响,尤其是在 Tenjoresmi 地区安排中的影响。实地研究结果表明,变更单对成本预算计划(RAB)和执行承包商的业绩造成了重大影响。受影响的部分工程包括更换空调品牌、用慢跑跑道取代露天剧场、拆除栏杆、拆除卫 生设施、拆除管道、拆除空调、清除拆迁垃圾、玻璃窗框、重新安装铝门窗框、墙壁扶手、 门、铁、处理挖掘出的砾石和种植灌木。RAB 分析表明,各种工程的费用比例发生了变化,如拆除和建筑费用增加,结构费用 减少。10 月和 11 月,由于合同增补件在 10 月中旬才获得批准,工程实施出现延误。但是,实施工程的承包商并没有遇到财务问题,甚至利润还增加了 0.79%。总之,变更单会影响项目时间和成本,但灵活的承包商可以很好地管理变更单,甚至优化利润。我们需要有效的管理来应对变化,确保建筑项目的顺利实施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信