Construction Management in the New Building Project for the Haji Medan General Hospital

Nur Anisa Syafira Bestari, Ridho Bayu Aji
{"title":"Construction Management in the New Building Project for the Haji Medan General Hospital","authors":"Nur Anisa Syafira Bestari, Ridho Bayu Aji","doi":"10.61166/interdisiplin.v1i2.10","DOIUrl":null,"url":null,"abstract":"Improving health services is one of the priorities in North Sumatra Province, a province that is currently carrying out a lot of development, one of which is the construction of hospitals which are used to meet the health needs of the people in North Sumatra. The development process carried out is a form of service improvement. This study was carried out to analyze the development management of RSU Haji Medan which was carried out by PT. KSO Adhi-Penta. Good construction management needs to be implemented to ensure that work can be completed according to the implementation schedule. The problem formulation in this research discusses three research focuses, namely: 1) Supervision of project management at RSU Haji Medan, 2) Arrangement of human and material resources, 3) Arrangement of scheduling of RSU Haji Medan project activities. The analytical method in this research was carried out using the and Build principle. The Design and Build method provides opportunities to increase time and cost efficiency. The results of this research are: 1) Construction supervision management ensures that all construction activities take place in accordance with the plans, specifications and standards that have been set. 2) Human resources (HR) and material factors cannot be separated because they will have an impact on the quality and running of the business activities carried out. Not only that, the quality of human resources and materials will provide maximum results. 3) PT. KSO Adhi-Penta's target for completion and implementation was successful in achieving the progress that had been determined step by step in accordance with the plan, this indicates that in the construction of RSU Haji Medan, the contractor or developer was successful in implementing management principles well.","PeriodicalId":514901,"journal":{"name":"INTERDISIPLIN: Journal of Qualitative and Quantitative Research","volume":"18 5","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"INTERDISIPLIN: Journal of Qualitative and Quantitative Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.61166/interdisiplin.v1i2.10","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Improving health services is one of the priorities in North Sumatra Province, a province that is currently carrying out a lot of development, one of which is the construction of hospitals which are used to meet the health needs of the people in North Sumatra. The development process carried out is a form of service improvement. This study was carried out to analyze the development management of RSU Haji Medan which was carried out by PT. KSO Adhi-Penta. Good construction management needs to be implemented to ensure that work can be completed according to the implementation schedule. The problem formulation in this research discusses three research focuses, namely: 1) Supervision of project management at RSU Haji Medan, 2) Arrangement of human and material resources, 3) Arrangement of scheduling of RSU Haji Medan project activities. The analytical method in this research was carried out using the and Build principle. The Design and Build method provides opportunities to increase time and cost efficiency. The results of this research are: 1) Construction supervision management ensures that all construction activities take place in accordance with the plans, specifications and standards that have been set. 2) Human resources (HR) and material factors cannot be separated because they will have an impact on the quality and running of the business activities carried out. Not only that, the quality of human resources and materials will provide maximum results. 3) PT. KSO Adhi-Penta's target for completion and implementation was successful in achieving the progress that had been determined step by step in accordance with the plan, this indicates that in the construction of RSU Haji Medan, the contractor or developer was successful in implementing management principles well.
哈吉棉兰综合医院新大楼项目的施工管理
改善医疗服务是北苏门答腊省的优先事项之一,该省目前正在进行大量开发工作,其中之一就是建设医院,以满足北苏门答腊省人民的医疗需求。所进行的发展过程就是一种改善服务的形式。本研究旨在分析由 PT.KSO Adhi-Penta进行的。需要实施良好的施工管理,以确保工程能够按照实施计划完成。本研究的问题制定讨论了三个研究重点,即1) 对哈吉棉兰 RSU 项目管理的监督,2) 人力和物力资源的安排,3) 哈吉棉兰 RSU 项目活动的时间安排。本研究的分析方法采用 "设计与建造 "原则。设计和建造方法提供了提高时间和成本效率的机会。研究结果如下1) 施工监理管理确保所有施工活动都按照既定的计划、规范和标准进行。2)人力资源(HR)和物质因素是不可分割的,因为它们会对业务活动的质量和运行产生影响。不仅如此,人力资源和材料的质量将带来最大的成果。3) PT.KSO Adhi-Penta公司的竣工和实施目标成功地实现了按照计划逐步确定的进度,这表明在RSU Haji Medan的建设过程中,承包商或开发商成功地贯彻了管理原则。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书