{"title":"Factor Analysis of Construction Discrepancy to Building Approval Documents (PBG)","authors":"Fadlun, Nirmalawati, T. Kamaludin","doi":"10.47191/etj/v9i02.02","DOIUrl":null,"url":null,"abstract":"In practice, there are often discrepancies between the physical construction of the building and the building permit documents provided by Dinas Penataan Ruang dan Pertanahan Kota Palu. These discrepancies can include various aspects, such as building design, structural design, layout, or unauthorized design changes. These non-conformities can also occur caused by various factors, such as insufficiently skilled resources, lack of communication between construction teams, unauthorized design changes, and lack of supervision. The aim of this research is to determine the factors that influence construction non-conformance with Building Approval documents (PBG) and the factors that most influence construction non-conformance with Building Approval documents (PBG) In this research, the sampling technique used was probability sampling with the number of respondents as many as 114 using the Slovin formula, and the application for a building construction permit was submitted to Dinas Penataan Ruang dan Pertanahan Kota Palu from January 2022 to June 2023. A total of 114 respondents were surveyed. Data collection uses observation techniques and distributing questionnaires. Data analysis using Factor Analysis. Based on research findings, there are seven factors that influence deviations from building permits (PBG) documents namely 1). Regulation and Supervision; 2) Resources; 3) Design; 4). Management; ; 5). Technical; 6). Sanctions and 7). Implementation. The size of the influence of all these factors reached 61.955%, The remaining 38.045% is influenced by other factors whose influence is less significant.","PeriodicalId":507832,"journal":{"name":"Engineering and Technology Journal","volume":"46 50","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-02-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering and Technology Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47191/etj/v9i02.02","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In practice, there are often discrepancies between the physical construction of the building and the building permit documents provided by Dinas Penataan Ruang dan Pertanahan Kota Palu. These discrepancies can include various aspects, such as building design, structural design, layout, or unauthorized design changes. These non-conformities can also occur caused by various factors, such as insufficiently skilled resources, lack of communication between construction teams, unauthorized design changes, and lack of supervision. The aim of this research is to determine the factors that influence construction non-conformance with Building Approval documents (PBG) and the factors that most influence construction non-conformance with Building Approval documents (PBG) In this research, the sampling technique used was probability sampling with the number of respondents as many as 114 using the Slovin formula, and the application for a building construction permit was submitted to Dinas Penataan Ruang dan Pertanahan Kota Palu from January 2022 to June 2023. A total of 114 respondents were surveyed. Data collection uses observation techniques and distributing questionnaires. Data analysis using Factor Analysis. Based on research findings, there are seven factors that influence deviations from building permits (PBG) documents namely 1). Regulation and Supervision; 2) Resources; 3) Design; 4). Management; ; 5). Technical; 6). Sanctions and 7). Implementation. The size of the influence of all these factors reached 61.955%, The remaining 38.045% is influenced by other factors whose influence is less significant.
在实践中,建筑物的实际建造情况与 Dinas Penataan Ruang dan Pertanahan Kota Palu 提供的建筑许可文件之间往往存在差异。这些差异可能涉及多个方面,如建筑设计、结构设计、布局或未经授权的设计变更。这些不符合要求的情况也可能是由各种因素造成的,如技术资源不足、施工团队之间缺乏沟通、未经授权的设计变更以及缺乏监督等。本研究的目的是确定影响建筑施工不符合建筑审批文件(PBG)的因素,以及对建筑施工不符合建筑审批文件(PBG)影响最大的因素。 在本研究中,使用的抽样技术是概率抽样,受访者人数多达 114 人,使用斯洛文公式进行抽样,建筑施工许可证申请于 2022 年 1 月至 2023 年 6 月期间提交至 Dinas Penataan Ruang dan Pertanahan Kota Palu。共调查了 114 名受访者。数据收集采用观察法和发放问卷法。数据分析采用因素分析法。根据研究结果,影响建筑许可(PBG)文件偏差的因素有七个,即 1).监管和监督;2)资源;3)设计;4)。管理;5).技术; 6).制裁和 7).实施。所有这些因素的影响程度达到 61.955%,其余 38.045%受其他因素的影响,这些因素的影响程度较小。