Methods of calculating electric power generation by wind turbines and their influence on wind speed

E. Bekirov, S. Voskresenskaya, Z. U. Ramazanova, O. S. Bekirov
{"title":"Methods of calculating electric power generation by wind turbines and their influence on wind speed","authors":"E. Bekirov, S. Voskresenskaya, Z. U. Ramazanova, O. S. Bekirov","doi":"10.30724/1998-9903-2023-25-5-30-41","DOIUrl":null,"url":null,"abstract":"RELEVANCE of the study lies in the analysis of the influence of specifying the wind speed interval on the calculation of electricity generation by certain wind turbines used in the Crimea. PURPOSE. Analysis of techniques that can be used to estimate electric power generation by wind turbines in various cases, as well as an assessment of the impact on the accuracy of the forecast of the speed indication interval when using \"semi-aggregated\" data. METHODS. Analytical and computational methods were used in the study, in particular, the variable substitution method, Rayleigh distribution, and the Milewski method. RESULTS. In the article the methods of calculating the electric power generation for three cases are considered. The first case uses primary observational data, so it is applicable only when a weather station is directly present in the area. The second case describes the course of calculations when the wind characteristics sensors are partially shaded and when the terrain is more complex. Here it is necessary to classify the degree of openness of the wind speed sensor. If the site is located far from weather stations or weather posts, the third method is used. In this case, the choice of interpolation nodes of the indicators of potential power generation can be quite complex. We also evaluated the effect of wind speed on electricity generation by a wind turbine. The number of aggregation intervals and the aggregation interval itself were changed, and the results were found for two wind turbines USW56-100 and T600-48, common in the Crimea. CONCLUSIONS. Wind energy is one of the promising areas, but often because of the differences between the forecast data and the actual, there are difficulties in integrating into the overall energy system. Therefore, it is important to develop methods for estimating the generation and accuracy in their use.","PeriodicalId":222237,"journal":{"name":"Power engineering: research, equipment, technology","volume":" 2","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Power engineering: research, equipment, technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30724/1998-9903-2023-25-5-30-41","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

RELEVANCE of the study lies in the analysis of the influence of specifying the wind speed interval on the calculation of electricity generation by certain wind turbines used in the Crimea. PURPOSE. Analysis of techniques that can be used to estimate electric power generation by wind turbines in various cases, as well as an assessment of the impact on the accuracy of the forecast of the speed indication interval when using "semi-aggregated" data. METHODS. Analytical and computational methods were used in the study, in particular, the variable substitution method, Rayleigh distribution, and the Milewski method. RESULTS. In the article the methods of calculating the electric power generation for three cases are considered. The first case uses primary observational data, so it is applicable only when a weather station is directly present in the area. The second case describes the course of calculations when the wind characteristics sensors are partially shaded and when the terrain is more complex. Here it is necessary to classify the degree of openness of the wind speed sensor. If the site is located far from weather stations or weather posts, the third method is used. In this case, the choice of interpolation nodes of the indicators of potential power generation can be quite complex. We also evaluated the effect of wind speed on electricity generation by a wind turbine. The number of aggregation intervals and the aggregation interval itself were changed, and the results were found for two wind turbines USW56-100 and T600-48, common in the Crimea. CONCLUSIONS. Wind energy is one of the promising areas, but often because of the differences between the forecast data and the actual, there are difficulties in integrating into the overall energy system. Therefore, it is important to develop methods for estimating the generation and accuracy in their use.
风力涡轮机发电量计算方法及其对风速的影响
本研究的意义在于分析指定风速间隔对克里米亚某些风力涡轮机发电量计算的影响。目的分析可用于估算各种情况下风力涡轮机发电量的技术,以及评估使用 "半汇总 "数据时对风速指示区间预测准确性的影响。研究采用了分析和计算方法,特别是变量替换法、瑞利分布法和米勒夫斯基法。结果。文章考虑了三种情况下的发电量计算方法。第一种情况使用的是原始观测数据,因此只有在该地区直接设有气象站时才适用。第二种情况描述的是风力特征传感器部分被遮挡和地形较为复杂时的计算过程。这里需要对风速传感器的开放程度进行分类。如果地点远离气象站或气象哨,则采用第三种方法。在这种情况下,潜在发电量指标插值节点的选择可能相当复杂。我们还评估了风速对风力涡轮机发电量的影响。我们改变了聚合区间的数量和聚合区间本身,并对克里米亚常见的两台风力涡轮机 USW56-100 和 T600-48 进行了评估。结论。风能是前景广阔的领域之一,但往往由于预测数据与实际数据之间的差异,在融入整个能源系统方面存在困难。因此,开发估算发电量和精确使用的方法非常重要。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信