{"title":"Progressive Collapse Resistance Assessment of a Multi-Column Frame Tube Structure with an Assembled Truss Beam Composite Floor under Different Column Removal Conditions","authors":"Rongguo Zhao, Guangfei Chen, Zaihua Zhang, Wei Luo","doi":"10.3390/buildings14010111","DOIUrl":null,"url":null,"abstract":"To estimate the progressive collapse resistance capacity of a multi-column frame tube structure with an assembled truss beam composite floor (ATBCF), pushdown analysis and nonlinear dynamic analysis are conducted for such a structure using the alternate load path (ALP) method. The bearing capacities of the remaining structures under three different work conditions, which are the side middle column removal, the edge middle column removal, and the corner column removal, are individually studied, and the collapse mechanism of the remaining structures is analyzed based on the aspects of the internal force redistribution and the failure mode of the second defense line. Simultaneously, the influence of the column failure time on the dynamic response of the remaining structure and the dynamic amplification coefficient is discussed. The results indicate that the residual bearing capacity of the remaining structure following the bottom corner column removal is higher than that of the one following the side or edge middle column removal, while the latter has a stronger plastic deformation capacity. When the ALP method is adopted to operate the progressive collapse analysis, it is reasonable to take the column failure time as 0.1 times the period of the first-order vertical vibration mode of the remaining structure, and it is suitable to set the dynamic amplification coefficient as 2.0, which is the ratio of the maximum dynamic displacement to the static displacement of the remaining structure under the transient loading condition.","PeriodicalId":48546,"journal":{"name":"Buildings","volume":"122 20","pages":""},"PeriodicalIF":3.1000,"publicationDate":"2023-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Buildings","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.3390/buildings14010111","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

To estimate the progressive collapse resistance capacity of a multi-column frame tube structure with an assembled truss beam composite floor (ATBCF), pushdown analysis and nonlinear dynamic analysis are conducted for such a structure using the alternate load path (ALP) method. The bearing capacities of the remaining structures under three different work conditions, which are the side middle column removal, the edge middle column removal, and the corner column removal, are individually studied, and the collapse mechanism of the remaining structures is analyzed based on the aspects of the internal force redistribution and the failure mode of the second defense line. Simultaneously, the influence of the column failure time on the dynamic response of the remaining structure and the dynamic amplification coefficient is discussed. The results indicate that the residual bearing capacity of the remaining structure following the bottom corner column removal is higher than that of the one following the side or edge middle column removal, while the latter has a stronger plastic deformation capacity. When the ALP method is adopted to operate the progressive collapse analysis, it is reasonable to take the column failure time as 0.1 times the period of the first-order vertical vibration mode of the remaining structure, and it is suitable to set the dynamic amplification coefficient as 2.0, which is the ratio of the maximum dynamic displacement to the static displacement of the remaining structure under the transient loading condition.
带装配式桁架梁复合楼板的多柱框架管式结构在不同拆柱条件下的抗渐进式坍塌能力评估
为了估算带装配式桁架梁复合楼板(ATBCF)的多柱框架管式结构的渐进抗倒塌能力,我们采用交替荷载路径(ALP)方法对该结构进行了推倒分析和非线性动力分析。分别研究了边中柱拆除、边中柱拆除和角柱拆除三种不同工况下剩余结构的承载力,并基于内力再分布和第二道防线的破坏模式分析了剩余结构的倒塌机理。同时,讨论了柱破坏时间对剩余结构动态响应和动态放大系数的影响。结果表明,底部角柱拆除后剩余结构的剩余承载力高于侧面或边缘中间柱拆除后的剩余结构,而后者的塑性变形能力更强。采用 ALP 方法进行渐进式坍塌分析时,将柱破坏时间取为剩余结构一阶竖向振型周期的 0.1 倍是合理的,将动态放大系数取为 2.0(即瞬态荷载条件下剩余结构最大动态位移与静态位移之比)也是合适的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Buildings
Buildings Multiple-
CiteScore
3.40
自引率
26.30%
发文量
1883
审稿时长
11 weeks
期刊介绍: BUILDINGS content is primarily staff-written and submitted information is evaluated by the editors for its value to the audience. Such information may be used in articles with appropriate attribution to the source. The editorial staff considers information on the following topics: -Issues directed at building owners and facility managers in North America -Issues relevant to existing buildings, including retrofits, maintenance and modernization -Solution-based content, such as tips and tricks -New construction but only with an eye to issues involving maintenance and operation We generally do not review the following topics because these are not relevant to our readers: -Information on the residential market with the exception of multifamily buildings -International news unrelated to the North American market -Real estate market updates or construction updates
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信