{"title":"ANÁLISE DA EVOLUÇÃO DOS PRINCIPAIS INSUMOS DA CONSTRUÇÃO CIVIL NOS ÚLTIMOS ANOS E SEU CONSUMO DURANTE O PERÍODO PANDÊMICO","authors":"CARLOS VICTOR SOUZA ANDRADE, FABIANO FAGUNDES","doi":"10.35265/2236-6717-240-12814","DOIUrl":null,"url":null,"abstract":"During the Covid-19 pandemic, the construction sector in Brazil faced significant obstacles, which included uncertainties, interruptions, the implementation of health regulations and guidelines, adoption of new working methods and, prominently, faced challenges arising from shortages and cost increases. The general objective of the present work is to analyze the evolution of the main inputs, while analyzing their consumption during the COVID-19 pandemic period. The methodology used was through a bibliographical review of the literature, with analysis of works published in the last 5 years. The main result found portrays the change in pricing of inputs since 2020, especially in the months considered the most troubled in the country, bringing prices to very high values. The conclusion of the work permeates the sense of showing how much the civil construction market is directly affected by external factors.","PeriodicalId":21289,"journal":{"name":"Revista Científica Semana Acadêmica","volume":"34 15","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista Científica Semana Acadêmica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35265/2236-6717-240-12814","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
During the Covid-19 pandemic, the construction sector in Brazil faced significant obstacles, which included uncertainties, interruptions, the implementation of health regulations and guidelines, adoption of new working methods and, prominently, faced challenges arising from shortages and cost increases. The general objective of the present work is to analyze the evolution of the main inputs, while analyzing their consumption during the COVID-19 pandemic period. The methodology used was through a bibliographical review of the literature, with analysis of works published in the last 5 years. The main result found portrays the change in pricing of inputs since 2020, especially in the months considered the most troubled in the country, bringing prices to very high values. The conclusion of the work permeates the sense of showing how much the civil construction market is directly affected by external factors.