Power System Analysis of Steam Power Plant Using ETAP at ULPL Indralaya South Sumatra

Thriska Dewi Umi Rasyda
{"title":"Power System Analysis of Steam Power Plant Using ETAP at ULPL Indralaya South Sumatra","authors":"Thriska Dewi Umi Rasyda","doi":"10.24036/jtip.v16i2.785","DOIUrl":null,"url":null,"abstract":"PT PLN (Persero) UPDK Keramasan have three group work units in South Sumatra Province which is study has located in Ogan Ilir Regency namely PT. PLN ULPL Indralaya. This study is one steam turbine generator unit often experiences shutdown due to several factors. One of them is out of service for the protection operating system on the 4 MVA to 11.5/6.9 kV transformer unit when there is a disturbance so that there is an inter-trip to the upstream system which results in a blackout system. We analyzed the disturbance using ETAP software. We made three analyzes there are load flow, short circuit and relay coordination. As study results submitted to PT PLN ULPL Indralaya is to scenario 3 for the analysis of the resulting lower flow is a decrease in load of about 63% for short circuit value obtained between 0.011 to 50.776 kA also relay coordination should be adding devices such as IDMT curve Long Time Inverse.","PeriodicalId":494071,"journal":{"name":"Jurnal teknologi informasi dan pendidikan","volume":"42 7","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal teknologi informasi dan pendidikan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24036/jtip.v16i2.785","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PT PLN (Persero) UPDK Keramasan have three group work units in South Sumatra Province which is study has located in Ogan Ilir Regency namely PT. PLN ULPL Indralaya. This study is one steam turbine generator unit often experiences shutdown due to several factors. One of them is out of service for the protection operating system on the 4 MVA to 11.5/6.9 kV transformer unit when there is a disturbance so that there is an inter-trip to the upstream system which results in a blackout system. We analyzed the disturbance using ETAP software. We made three analyzes there are load flow, short circuit and relay coordination. As study results submitted to PT PLN ULPL Indralaya is to scenario 3 for the analysis of the resulting lower flow is a decrease in load of about 63% for short circuit value obtained between 0.011 to 50.776 kA also relay coordination should be adding devices such as IDMT curve Long Time Inverse.
利用ETAP对南苏门答腊因德拉拉亚ULPL蒸汽电厂动力系统进行分析
PT PLN (Persero) UPDK Keramasan在南苏门答腊省有三个小组工作单位,他们的研究位于Ogan Ilir Regency,即PT. PLN ULPL Indralaya。本文研究了汽轮发电机组由于多种因素而经常发生停堆的情况。其中一个在4mva至11.5/6.9 kV变机组的保护操作系统中,当发生扰动时,上游系统发生跳闸,导致系统停电。利用ETAP软件对扰动进行分析。从负荷潮流、短路和继电器协调三个方面进行了分析。由于研究结果提交给PT PLN ULPL Indralaya是对场景3进行分析,由此产生的较低流量是负载减少约63%,短路值在0.011至50.776 kA之间获得,继电器协调也应添加IDMT曲线长时间逆等装置。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信