{"title":"Analisis Pelepasan Beban Sistem Jaringan Bengkulu dengan Penambahan PLTU Teluk Sepang 2x100 MW","authors":"Afriyastuti Herawati, None Rinda Apriliani, None Irnanda Priyadi, None Ika Novia Anggraini, None Yuli Rodiah, None Nilda Tri Putri","doi":"10.33369/jamplifier.v13i1.27361","DOIUrl":null,"url":null,"abstract":"Load shedding is one way to overcome the rapid decrease in frequency due to transient disturbances. With load shedding the rate of decrease in system frequency can be slowed down so as to avoid total blackouts in the power system. Currently, the Bengkulu network system has added a new power plant, namely PLTU 2 x 100 MW in Teluk Sepang. This paper analyzes load shedding on the Bengkulu network system after the inclusion of PLTU Teluk Sepang. The proposed method is load shedding taking into account the Rate Of Change Of Frequency (ROCOF) and critical fault clearing time (CCT) after a transient fault occurs and then analyzing the stability of the system transient before and after the load shedding occurs with three phase short circuit disturbance. The analysis found that the proposed method succeeded in returning the dropped frequency to the permitted frequency value and the system showed a stable response after a transient disturbance occurred.","PeriodicalId":498338,"journal":{"name":"Jurnal Amplifier","volume":"285 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Amplifier","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33369/jamplifier.v13i1.27361","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Load shedding is one way to overcome the rapid decrease in frequency due to transient disturbances. With load shedding the rate of decrease in system frequency can be slowed down so as to avoid total blackouts in the power system. Currently, the Bengkulu network system has added a new power plant, namely PLTU 2 x 100 MW in Teluk Sepang. This paper analyzes load shedding on the Bengkulu network system after the inclusion of PLTU Teluk Sepang. The proposed method is load shedding taking into account the Rate Of Change Of Frequency (ROCOF) and critical fault clearing time (CCT) after a transient fault occurs and then analyzing the stability of the system transient before and after the load shedding occurs with three phase short circuit disturbance. The analysis found that the proposed method succeeded in returning the dropped frequency to the permitted frequency value and the system showed a stable response after a transient disturbance occurred.
减载是克服暂态扰动引起的频率快速下降的一种方法。通过减载可以减缓系统频率的下降速度,从而避免电力系统的全面停电。目前,明古鲁网络系统已经增加了一个新的发电厂,即PLTU 2 x 100兆瓦在Teluk雪邦。本文分析了明古鲁网络系统在加入PLTU Teluk雪邦后的减载情况。该方法考虑暂态故障发生后的频率变化率(ROCOF)和临界故障清除时间(CCT),分析三相短路扰动下系统暂态降载前后的稳定性。分析表明,该方法成功地将下降的频率恢复到允许的频率值,并且在瞬态扰动发生后系统表现出稳定的响应。