Management of R&D in OECD Countries: Experience in Results’ Monitoring

O. Bogacheva, O. Smorodinov
{"title":"Management of R&D in OECD Countries: Experience in Results’ Monitoring","authors":"O. Bogacheva, O. Smorodinov","doi":"10.20542/0131-2227-2023-67-9-58-67","DOIUrl":null,"url":null,"abstract":"The article deals with the issues related to the monitoring of R&D projects supported by the public funds. In accordance with the current legislation, monitoring of scientific, technical and innovation projects is carried out within the framework of the structural elements of state programs. To conduct monitoring, results, control points and objects of scientific and technical activities should be established. At the same time, however, within the framework of the three forms of financial support for the implementation of R&D projects – grant financing, subsidies for the implementation of public assignments, public procurement – different monitoring methods and procedures are applied. Further, the names of the control points are not linked to the results of projects in terms of technology readiness levels (TRL). Finally, information systems that support the monitoring and evaluation of R&D results are not fully compatible with each other. As a result, the overall effectiveness of monitoring decreases, which leads to delays in making managerial decisions and entails wasteful spending of budget funds. In the leading OECD countries, there is a practice of centralized methodological support of the implementation of R&D and innovation, which provides an unified approach to management of such projects and conjugation of state support at all stages of innovation cycle. Successful project management involves application of such specific management tools as the stage gates model and TRL methodology, which provide effective monitoring of results and flexibility in making management decisions, including the possibility of adjusting the basic parameters of projects at different stages of their implementation. The experience of foreign countries shows that in order to improve the quality and effectiveness of monitoring of R&D projects in Russia, it is necessary to ensure the harmonization of general and sectoral legislation governing the monitoring of the results of research, development and innovation projects, which will ensure the formation of a unified approach within the framework of project management of state programs. It is advisable to extend the rules for monitoring the results of R&D adopted in the system of grant financial support to the systems of public assignment and public procurement in this area of activity, creating conditions for the conjugation of various forms of public support. Finally, it is necessary to improve operation of the existing state information resources for the management of scientific, technical and innovation projects.","PeriodicalId":398103,"journal":{"name":"World Economy and International Relations","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Economy and International Relations","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20542/0131-2227-2023-67-9-58-67","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The article deals with the issues related to the monitoring of R&D projects supported by the public funds. In accordance with the current legislation, monitoring of scientific, technical and innovation projects is carried out within the framework of the structural elements of state programs. To conduct monitoring, results, control points and objects of scientific and technical activities should be established. At the same time, however, within the framework of the three forms of financial support for the implementation of R&D projects – grant financing, subsidies for the implementation of public assignments, public procurement – different monitoring methods and procedures are applied. Further, the names of the control points are not linked to the results of projects in terms of technology readiness levels (TRL). Finally, information systems that support the monitoring and evaluation of R&D results are not fully compatible with each other. As a result, the overall effectiveness of monitoring decreases, which leads to delays in making managerial decisions and entails wasteful spending of budget funds. In the leading OECD countries, there is a practice of centralized methodological support of the implementation of R&D and innovation, which provides an unified approach to management of such projects and conjugation of state support at all stages of innovation cycle. Successful project management involves application of such specific management tools as the stage gates model and TRL methodology, which provide effective monitoring of results and flexibility in making management decisions, including the possibility of adjusting the basic parameters of projects at different stages of their implementation. The experience of foreign countries shows that in order to improve the quality and effectiveness of monitoring of R&D projects in Russia, it is necessary to ensure the harmonization of general and sectoral legislation governing the monitoring of the results of research, development and innovation projects, which will ensure the formation of a unified approach within the framework of project management of state programs. It is advisable to extend the rules for monitoring the results of R&D adopted in the system of grant financial support to the systems of public assignment and public procurement in this area of activity, creating conditions for the conjugation of various forms of public support. Finally, it is necessary to improve operation of the existing state information resources for the management of scientific, technical and innovation projects.
经合组织国家的研发管理:成果监测的经验
本文论述了公共资金支持的r&d项目的监控问题。根据现行法律,科学、技术和创新项目的监测是在国家计划结构要素的框架内进行的。要进行监测,应确定科技活动的结果、控制点和对象。但与此同时,在执行研发项目的三种财政支助形式- -赠款资助、执行公共任务的补贴、公共采购- -的框架内,采用了不同的监测方法和程序。此外,控制点的名称与技术准备水平(TRL)方面的项目结果没有联系。最后,支持监测和评价研发成果的信息系统彼此之间并不完全兼容。结果,监测的总体有效性下降,从而导致管理决策的延误,并造成预算资金的浪费。在主要的经合组织国家,对研发和创新的实施有一种集中的方法支持的做法,这为管理这些项目和在创新周期的所有阶段结合国家支持提供了统一的方法。成功的项目管理涉及到阶段门模型和TRL方法等具体管理工具的应用,这些工具提供了对结果的有效监测和制定管理决策的灵活性,包括在项目实施的不同阶段调整项目基本参数的可能性。国外的经验表明,为了提高俄罗斯研发项目监测的质量和有效性,有必要确保研究、开发和创新项目结果监测的一般和部门立法的协调,这将确保在国家方案项目管理框架内形成统一的方法。最好将赠款财政支助制度中采用的监测研发成果的规则扩大到这一活动领域的公共分配和公共采购制度,为各种形式的公共支助结合起来创造条件。最后,完善现有国家信息资源的运作,为科技创新项目管理服务。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信