{"title":"PENGARUH SEMANGAT KERJA TERHADAP PROGRESS PADA PROYEK GUDANG SURYA GRAND CISOKA","authors":"Carlos Chandra, Widodo Kushartomo","doi":"10.24912/jmts.v6i2.23047","DOIUrl":null,"url":null,"abstract":"The spirit at work is is a very important aspect in carrying out a construction activity. This morale can affect the length of time it takes to work on a project, if the lower the morale of the workers, the longer it will take to carry out the development project. This work spirit is closely related to the time spent on a construction project. This study aims to determine the effect of morale on the progress of project realization. This type of research uses data collection techniques carried out using observation and interviews conducted through question and answer between researchers and informants. The population in this study were workers who worked in the Surya Grand Cisoka warehouse development project and the samples taken for this study were 6 workers. The results of the case studies show that the morale of the workers has an important role or a very significant contribution to the progress of the realization of project development. The results of this study indicate that on average the morale of workers decreases because their wages are late for days. Abstrak Semangat kerja merupakan aspek yang sangat penting didalam menjalani sebuah kegiatan konstruksi. Semangat kerja ini dapat mempengaruhi lama waktu pengerjaan suatu proyek. Semakin rendah semangat kerja para pekerja maka semakin lama juga waktu yang dibutuhkan dalam melakukan proyek pembangunan tersebut. Semangat kerja ini sangat berkaitan dengan waktu pengerjaan sebuah proyek konstruksi. Penelitian ini bertujuan untuk mengetahui pengaruh semangat kerja pada progress realisasi proyek. Teknik pengumpulan data dilakukan menggunakan observasi dan wawancara antara peneliti dan narasumber. Populasi dalam penelitian ini adalah para pekerja yang bekerja di proyek pembangunan gudang Surya Grand Cisoka dan sampel yang diambil untuk penelitian ini sebanyak 6 orang pekerja. Hasil studi kasus menunjukan bahwa semangat kerja para pekerja mempunyai peran penting atau kontribusi yang sangat berarti bagi progress realisasi pembangunan proyek. Dari hasil penelitian ini menunjukan bahwa rata rata semangat pekerja menurun karena upah mereka yang telat berhari-hari.","PeriodicalId":493953,"journal":{"name":"Jurnal Mitra Teknik Sipil","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Mitra Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24912/jmts.v6i2.23047","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The spirit at work is is a very important aspect in carrying out a construction activity. This morale can affect the length of time it takes to work on a project, if the lower the morale of the workers, the longer it will take to carry out the development project. This work spirit is closely related to the time spent on a construction project. This study aims to determine the effect of morale on the progress of project realization. This type of research uses data collection techniques carried out using observation and interviews conducted through question and answer between researchers and informants. The population in this study were workers who worked in the Surya Grand Cisoka warehouse development project and the samples taken for this study were 6 workers. The results of the case studies show that the morale of the workers has an important role or a very significant contribution to the progress of the realization of project development. The results of this study indicate that on average the morale of workers decreases because their wages are late for days. Abstrak Semangat kerja merupakan aspek yang sangat penting didalam menjalani sebuah kegiatan konstruksi. Semangat kerja ini dapat mempengaruhi lama waktu pengerjaan suatu proyek. Semakin rendah semangat kerja para pekerja maka semakin lama juga waktu yang dibutuhkan dalam melakukan proyek pembangunan tersebut. Semangat kerja ini sangat berkaitan dengan waktu pengerjaan sebuah proyek konstruksi. Penelitian ini bertujuan untuk mengetahui pengaruh semangat kerja pada progress realisasi proyek. Teknik pengumpulan data dilakukan menggunakan observasi dan wawancara antara peneliti dan narasumber. Populasi dalam penelitian ini adalah para pekerja yang bekerja di proyek pembangunan gudang Surya Grand Cisoka dan sampel yang diambil untuk penelitian ini sebanyak 6 orang pekerja. Hasil studi kasus menunjukan bahwa semangat kerja para pekerja mempunyai peran penting atau kontribusi yang sangat berarti bagi progress realisasi pembangunan proyek. Dari hasil penelitian ini menunjukan bahwa rata rata semangat pekerja menurun karena upah mereka yang telat berhari-hari.
工作精神是开展建设活动的一个非常重要的方面。这种士气可以影响在项目上工作的时间长度,如果工人的士气越低,执行开发项目所需的时间就越长。这种工作精神与花在建设项目上的时间密切相关。本研究旨在确定士气对项目实现进度的影响。这种类型的研究使用数据收集技术,通过观察和访谈,通过研究人员和举报人之间的问答进行。本研究的人群是在Surya Grand Cisoka仓库开发项目中工作的工人,本研究的样本是6名工人。案例研究的结果表明,工人的士气对项目开发的进度实现具有重要作用或非常显著的贡献。这项研究的结果表明,平均而言,工人的士气下降,因为他们的工资晚了几天。[摘要]在此基础上,我们提出了一种新的研究方法。Semangat kerja ini dapat mempengaruhi lama waktu pengerjaan suatu proyek。我的女儿,我的女儿,我的女儿,我的女儿,我的女儿,我的女儿,我的女儿,我的女儿Semangat kerja ini sangat berkaitan dengan waktu pengerjaan sebuah proyek konstruksi。Penelitian ini bertujuan untuk mengetahui pengaruh semangat kerja pata progress realisisproyek。尼泊尔的人口普查数据,蒙古的人口普查数据,尼泊尔的人口普查数据,尼泊尔的人口普查数据。Populasi dalam penelitian ini adalah para pekerja yang bekerja di proyek pembangunan gudang Surya大西西卡丹样本yang diambil untuk penelitian ini sebanyak 6橙色pekerja。在未来几年,我们将会有更多的时间来研究未来的发展,我们将会有更多的时间来研究未来的发展。她说:“我的女儿,我的女儿,我的女儿,我的女儿,我的女儿,我的女儿,我的女儿,我的女儿,我的女儿。