J. Lerche, O. Seppänen, Kristian Birch Pedersen, H. Neve, S. Wandahl, A. Gross
{"title":"Why Would Location-Based Scheduling Be Applicable for Offshore Wind Turbine Construction?","authors":"J. Lerche, O. Seppänen, Kristian Birch Pedersen, H. Neve, S. Wandahl, A. Gross","doi":"10.24928/2019/0121","DOIUrl":null,"url":null,"abstract":"The focus in this research was the conversion of a traditional activity-based construction schedule to a location-based schedule. The case investigated was an offshore wind turbine project in the British sector of the North Sea. This exploratory case study used a deductive approach studying the literature. The initial step was a review of the location-based scheduling literature. The applicability of the theory could be tested through understanding the patterns from existing location-based scheduling literature. These patterns were the adapted from the construction context to the offshore wind construction context. With the knowledge of how and why from a theoretical perspective, the authors analyzed the existing construction schedule which was based on the critical path methodology. The results from this analysis provided knowledge about how location-based scheduling is applicable from an industrial perspective. This research contributes knowledge by testing the theory of location-based scheduling in the context of offshore wind turbine construction industry.","PeriodicalId":278113,"journal":{"name":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2019/0121","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10
Abstract
The focus in this research was the conversion of a traditional activity-based construction schedule to a location-based schedule. The case investigated was an offshore wind turbine project in the British sector of the North Sea. This exploratory case study used a deductive approach studying the literature. The initial step was a review of the location-based scheduling literature. The applicability of the theory could be tested through understanding the patterns from existing location-based scheduling literature. These patterns were the adapted from the construction context to the offshore wind construction context. With the knowledge of how and why from a theoretical perspective, the authors analyzed the existing construction schedule which was based on the critical path methodology. The results from this analysis provided knowledge about how location-based scheduling is applicable from an industrial perspective. This research contributes knowledge by testing the theory of location-based scheduling in the context of offshore wind turbine construction industry.