Technical requirements for the connection of dispersed generation to the grid

S. Papathanassiou, N. Hatziargyriou
{"title":"Technical requirements for the connection of dispersed generation to the grid","authors":"S. Papathanassiou, N. Hatziargyriou","doi":"10.1109/PESS.2001.970141","DOIUrl":null,"url":null,"abstract":"The penetration of dispersed generation (DG) sources in the grids is constantly increasing, as a result of both technological advancements and institutional changes in the electric power industry. The connection of new installations is often hindered by a variety of factors, including technical considerations and requirements, usually resolved at the expense of the investor. As the interest for installing new generation facilities escalates, the adoption of transparent and easily applicable technical evaluation procedures becomes imperative. In this paper, the methodology and limits adopted in the connection guide of the Greek utility are outlined. Issues addressed are the steady state and fast voltage variations, as well as flicker and harmonic emissions. Simplified evaluation procedures are proposed, largely based on the relevant IEC publications, which are suitable for practical situations.","PeriodicalId":273578,"journal":{"name":"2001 Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.01CH37262)","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"33","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2001 Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.01CH37262)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESS.2001.970141","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 33

Abstract

The penetration of dispersed generation (DG) sources in the grids is constantly increasing, as a result of both technological advancements and institutional changes in the electric power industry. The connection of new installations is often hindered by a variety of factors, including technical considerations and requirements, usually resolved at the expense of the investor. As the interest for installing new generation facilities escalates, the adoption of transparent and easily applicable technical evaluation procedures becomes imperative. In this paper, the methodology and limits adopted in the connection guide of the Greek utility are outlined. Issues addressed are the steady state and fast voltage variations, as well as flicker and harmonic emissions. Simplified evaluation procedures are proposed, largely based on the relevant IEC publications, which are suitable for practical situations.
分散发电并网技术要求
由于电力行业的技术进步和制度变革,分布式发电(DG)在电网中的渗透率不断提高。新装置的连接经常受到各种因素的阻碍,包括技术考虑和要求,通常由投资者承担费用。随着安装新一代设施的兴趣不断升级,采用透明和易于应用的技术评估程序变得势在必行。本文概述了希腊公用事业连接指南中采用的方法和限制。解决的问题是稳态和快速电压变化,以及闪烁和谐波发射。提出了简化的评价程序,主要根据有关的IEC出版物,适合于实际情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信