{"title":"MRP with imprecise demand and uncertain lead time","authors":"R. Guillaume, C. Thierry, B. Grabot","doi":"10.2991/eusflat.2011.131","DOIUrl":null,"url":null,"abstract":"Taking into account the uncertainty of real data in the planning process is a real challenge for nowadays companies. It is suggested in this communication to take into account the demand uncertainty, but also the uncertainty on the lead times, for deciding which quantities of components should be released, and when. In that purpose, the various situations that may happen are summarized in a graph which design is detailed here.","PeriodicalId":403191,"journal":{"name":"EUSFLAT Conf.","volume":"33 1-2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-08-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"EUSFLAT Conf.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/eusflat.2011.131","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4
Abstract
Taking into account the uncertainty of real data in the planning process is a real challenge for nowadays companies. It is suggested in this communication to take into account the demand uncertainty, but also the uncertainty on the lead times, for deciding which quantities of components should be released, and when. In that purpose, the various situations that may happen are summarized in a graph which design is detailed here.