Pengaruh Kesiapan Perencanaan Detail Bendungan Terhadap Kinerja Pelaksanaan Kontrak dari Aspek Biaya, Waktu dan Mutu (Studi Kasus Pelaksanaan Bendungan Tiga Dihaji Paket 2 Sumatera Selatan)

Dwi Prasetyo Kusumo Raharjo, S. Sutardi
{"title":"Pengaruh Kesiapan Perencanaan Detail Bendungan Terhadap Kinerja Pelaksanaan Kontrak dari Aspek Biaya, Waktu dan Mutu (Studi Kasus Pelaksanaan Bendungan Tiga Dihaji Paket 2 Sumatera Selatan)","authors":"Dwi Prasetyo Kusumo Raharjo, S. Sutardi","doi":"10.25105/cesd.v4i2.10416","DOIUrl":null,"url":null,"abstract":"The Tiga Dihaji Dam Project is located on the Selabung River, Sukabumi Village, Tiga Dihaji, South Ogan Komering Ulu, South Sumatra. In the implementation of this project, several detailed dam planning is needed to support the construction process. Problems that occurred after the determination of the RMK (Rencana Mutu Kerja) as a project implementation guide are (1.) There are no synchronization work between packages (road and bridge access, diversion tunnel), (2.)There are design changes (grouting gallery, specification of main dam embankment material) and (3.) The quarry and borrow land acquisition. These three problems result in the potential for extension time and additional costs significantly.This research aims to examine the steps and methods needed to agree on the necessary contract amendments to overcome problems from the aspect of cost, time and quality. Fishbone analysis method is needed to analyze problems and impacts and to simulate improvement efforts for initial and post-repair conditions. The earned value analysis method is used to estimate the additional costs and extension of the contract execution time.The results of this research indicate a simulation process for the necessary improvement efforts by considering suggestions from competent parties, the Dam Safety Commission, which requires a significant increase in costs and additional implementation time. If the issue of the covid-19 pandemic and refocusing of the budget are also taken into consideration, then overall it will cost around 60% of the original contract and an extension of time for 41 months (estimated to be completed in 2027). Based on the simulation, the proposal for contract amendment from the aspect of cost and time is in progress.","PeriodicalId":103613,"journal":{"name":"INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD)","volume":"70 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25105/cesd.v4i2.10416","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Tiga Dihaji Dam Project is located on the Selabung River, Sukabumi Village, Tiga Dihaji, South Ogan Komering Ulu, South Sumatra. In the implementation of this project, several detailed dam planning is needed to support the construction process. Problems that occurred after the determination of the RMK (Rencana Mutu Kerja) as a project implementation guide are (1.) There are no synchronization work between packages (road and bridge access, diversion tunnel), (2.)There are design changes (grouting gallery, specification of main dam embankment material) and (3.) The quarry and borrow land acquisition. These three problems result in the potential for extension time and additional costs significantly.This research aims to examine the steps and methods needed to agree on the necessary contract amendments to overcome problems from the aspect of cost, time and quality. Fishbone analysis method is needed to analyze problems and impacts and to simulate improvement efforts for initial and post-repair conditions. The earned value analysis method is used to estimate the additional costs and extension of the contract execution time.The results of this research indicate a simulation process for the necessary improvement efforts by considering suggestions from competent parties, the Dam Safety Commission, which requires a significant increase in costs and additional implementation time. If the issue of the covid-19 pandemic and refocusing of the budget are also taken into consideration, then overall it will cost around 60% of the original contract and an extension of time for 41 months (estimated to be completed in 2027). Based on the simulation, the proposal for contract amendment from the aspect of cost and time is in progress.
大坝计划细节规划对成本、时间和质量等合同执行绩效的影响(南苏门答腊2号防洪堤个案研究)
Tiga Dihaji大坝项目位于南苏门答腊岛南Ogan Komering Ulu Tiga Dihaji Sukabumi村的Selabung河上。在本工程的实施过程中,需要进行几项详细的大坝规划,以支持施工过程。确定RMK (Rencana Mutu Kerja)作为项目实施指南后出现的问题有(1)。包之间没有同步工作(路桥通道、引水隧道),(2)。设计变更(注浆廊、主坝路堤材料规范);采石场和借地征用。这三个问题可能会导致工期延长和成本增加。本研究旨在探讨从成本、时间和质量等方面,就必要的合同修改达成一致所需要的步骤和方法。需要鱼骨分析方法来分析问题和影响,并模拟初始和修复后条件下的改进努力。采用挣值分析法对合同的附加成本和合同执行时间的延长进行了估算。这项研究的结果表明,通过考虑主管方(大坝安全委员会)的建议,需要进行必要的改进工作的模拟过程,这需要显著增加成本和额外的实施时间。如果考虑到新冠肺炎疫情和重新调整预算的问题,总体费用将达到原合同的60%左右,并将延期41个月(预计于2027年完成)。在仿真的基础上,从成本和时间两个方面提出了修改合同的建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信