Validation of the Power Plant Controller for Frequency Support Applications Using Hardware-in-the-Loop Testing

Mo’ath Farraj, R. Salehi, A. Momeni, A. Zamani, Rohit Kadem
{"title":"Validation of the Power Plant Controller for Frequency Support Applications Using Hardware-in-the-Loop Testing","authors":"Mo’ath Farraj, R. Salehi, A. Momeni, A. Zamani, Rohit Kadem","doi":"10.1109/EESAT55007.2022.9998033","DOIUrl":null,"url":null,"abstract":"In recent years, the significant integration of inverter-based resources (IBRs) for grid support applications and ancillary services has increased system complexity and challenges. To address the challenges associated with the declining inertia of the system, the transmission system operators (TSO) have implemented obligatory frequency regulation anciIRllary services to be followed by customers. This paper presents the process of testing the compliance of a power plant controller (PPC) by the Electric Reliability Council of Texas (ERCOT) before deployment in the field. In particular, the functionality of primary frequency response (PFR) and fast frequency response (FFR) controllers of the PPC is demonstrated through hardware-in-the-loop (HIL) testing. The results show that tuned PPC controller with proper integration into the system can comply with ERCOT requirements.","PeriodicalId":310250,"journal":{"name":"2022 IEEE Electrical Energy Storage Application and Technologies Conference (EESAT)","volume":"54 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE Electrical Energy Storage Application and Technologies Conference (EESAT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EESAT55007.2022.9998033","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

In recent years, the significant integration of inverter-based resources (IBRs) for grid support applications and ancillary services has increased system complexity and challenges. To address the challenges associated with the declining inertia of the system, the transmission system operators (TSO) have implemented obligatory frequency regulation anciIRllary services to be followed by customers. This paper presents the process of testing the compliance of a power plant controller (PPC) by the Electric Reliability Council of Texas (ERCOT) before deployment in the field. In particular, the functionality of primary frequency response (PFR) and fast frequency response (FFR) controllers of the PPC is demonstrated through hardware-in-the-loop (HIL) testing. The results show that tuned PPC controller with proper integration into the system can comply with ERCOT requirements.
使用硬件在环测试验证电厂控制器的频率支持应用
近年来,基于逆变器的资源(IBRs)在电网支持应用和辅助服务中的显著整合增加了系统的复杂性和挑战。为了解决与系统惯性下降相关的挑战,传输系统运营商(TSO)已经实施了强制性的频率调节辅助服务,以供客户遵循。本文介绍了电厂控制器(PPC)在现场部署前由德克萨斯州电力可靠性委员会(ERCOT)进行符合性测试的过程。特别是,PPC的主频响(PFR)和快速频响(FFR)控制器的功能通过硬件在环(HIL)测试进行了验证。结果表明,调整后的PPC控制器适当地集成到系统中,可以满足ERCOT的要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信