Pedro Mejía-Alvarez, E. Levner, D. Mossé
{"title":"An Integrated Heuristic Approach to Power-Aware Real-Time Scheduling","authors":"Pedro Mejía-Alvarez, E. Levner, D. Mossé","doi":"10.1007/3-540-36612-1_5","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":112226,"journal":{"name":"Power-Aware Computer Systems","volume":"30 7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2002-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Power-Aware Computer Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/3-540-36612-1_5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9