Increasing Transmission Capacity Case Studies and Techniques Increased Transmission Capacity by Increasing Ground Clearance - A Manufacturers Perspective
{"title":"Increasing Transmission Capacity Case Studies and Techniques Increased Transmission Capacity by Increasing Ground Clearance - A Manufacturers Perspective","authors":"B. Reisdorff","doi":"10.1109/TDCLLM.2006.340742","DOIUrl":null,"url":null,"abstract":"Utilities throughout North America are faced with existing transmission lines that are limited in capacity due to ground clearance. This limitation can be as much as 20 to 25% of the line's capacity. Therefore utilities have a need to increase ground clearance and have several options available.","PeriodicalId":193517,"journal":{"name":"ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.2006.340742","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
Utilities throughout North America are faced with existing transmission lines that are limited in capacity due to ground clearance. This limitation can be as much as 20 to 25% of the line's capacity. Therefore utilities have a need to increase ground clearance and have several options available.