The Convergence of Central Office and Customer Located Power Equipment

I. G. White, R. New
{"title":"The Convergence of Central Office and Customer Located Power Equipment","authors":"I. G. White, R. New","doi":"10.1109/INTLEC.1984.4794087","DOIUrl":null,"url":null,"abstract":"This paper reviews the power system used in British Telecom (BT) Telephone Exchanges (Central Offices) and the growing customer located power equipment demands. The increasing switching density of modern telecommunications equipment and the changes in power density of converters and batteries are the major factors in the revolution in power supply systems. The adoption by BT of high frequency converters and sealed batteries as the recommended provision for new power plant is a major step forward and leads to the possibility of standard power modules suitable for both Central Office and customer located systems. With the expansion of telecommunication systems and facilities, flexibility of power supply is a major factor and the advantages of standard power units in modular form, which can be built into a variety of systems meeting the reliability requirements, virtually off the shelf, are discussed. The present power rack system using relatively small rectifiers increases the overall reliability. The next step and the limit of convergence are considered.","PeriodicalId":132848,"journal":{"name":"INTELEC '84 - International Telecommunications Energy Conference","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1984-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"INTELEC '84 - International Telecommunications Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.1984.4794087","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper reviews the power system used in British Telecom (BT) Telephone Exchanges (Central Offices) and the growing customer located power equipment demands. The increasing switching density of modern telecommunications equipment and the changes in power density of converters and batteries are the major factors in the revolution in power supply systems. The adoption by BT of high frequency converters and sealed batteries as the recommended provision for new power plant is a major step forward and leads to the possibility of standard power modules suitable for both Central Office and customer located systems. With the expansion of telecommunication systems and facilities, flexibility of power supply is a major factor and the advantages of standard power units in modular form, which can be built into a variety of systems meeting the reliability requirements, virtually off the shelf, are discussed. The present power rack system using relatively small rectifiers increases the overall reliability. The next step and the limit of convergence are considered.
中心局与客户定位电力设备的融合
本文综述了英国电信(BT)电话交换机(中心局)使用的电力系统和日益增长的客户定位电力设备需求。现代通信设备的开关密度不断增加,变换器和电池功率密度的变化是供电系统变革的主要因素。英国电信采用高频转换器和密封电池作为新发电厂的推荐配置是向前迈出的重要一步,并导致适用于中央办公室和客户定位系统的标准功率模块的可能性。随着电信系统和设施的扩展,电源的灵活性是一个主要因素,并讨论了模块化形式的标准电源单元的优势,它可以构建成满足可靠性要求的各种系统,几乎是现成的。目前的电源机架系统使用相对较小的整流器,提高了整体可靠性。考虑了下一步和收敛极限。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信