{"title":"Variable neighborhood search-based subproblem solution procedures for a parallel shifting bottleneck heuristic for complex job shops","authors":"Andrew Bilyk, L. Mönch","doi":"10.1109/CoASE.2012.6386462","DOIUrl":null,"url":null,"abstract":"The shifting bottleneck heuristic (SBH) for complex job shops decomposes the overall scheduling problem into a series of scheduling problems related to machine groups. These smaller, more tractable, scheduling problems are called subproblems. The heuristic is based on a disjunctive graph that is used to model the relationship between the sub-problems. In this paper, we use a parallel implementation of the SBH to assess the impact of a variable neighborhood search-based subproblem solution procedure (SSP) on global performance measures like the total weighted tardiness. Based on designed simulation experiments, we demonstrate the advantage of using high-quality SSPs.","PeriodicalId":430428,"journal":{"name":"2012 IEEE International Conference on Automation Science and Engineering (CASE)","volume":"620 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-12-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE International Conference on Automation Science and Engineering (CASE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CoASE.2012.6386462","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4
Abstract
The shifting bottleneck heuristic (SBH) for complex job shops decomposes the overall scheduling problem into a series of scheduling problems related to machine groups. These smaller, more tractable, scheduling problems are called subproblems. The heuristic is based on a disjunctive graph that is used to model the relationship between the sub-problems. In this paper, we use a parallel implementation of the SBH to assess the impact of a variable neighborhood search-based subproblem solution procedure (SSP) on global performance measures like the total weighted tardiness. Based on designed simulation experiments, we demonstrate the advantage of using high-quality SSPs.