Konsep Penerapan ISO 45001:2018 dalam Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) Tahap Survei Tapak pada Lokasi Pembangunan PLTN di Kalimantan Barat

Widjanarko Widjanarko, Khusnul Khotimah
{"title":"Konsep Penerapan ISO 45001:2018 dalam Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) Tahap Survei Tapak pada Lokasi Pembangunan PLTN di Kalimantan Barat","authors":"Widjanarko Widjanarko, Khusnul Khotimah","doi":"10.31153/ppis.2021.123","DOIUrl":null,"url":null,"abstract":"Occupational Health and Safety is a problem that has attracted the attention of many organizations because it problem in terms of human, economic, political, legal, responsibility, and image's organizational. The plan for a commercial-scale nuclear power plant to be built in West Kalimantan requires careful preparation. No exception during the site survey, because it must finish carefully. The nuclear power plant site survey obtains data and information for later evaluation and assessment of physical and non-physical conditions. A site survey carried out in a planned manner and supported by adequate infrastructure according to standards will produce data and information that can be ascertained. To support the activities of the nuclear power plant site survey to run smoothly, safely, and safely, it is necessary to apply the SNI ISO 45001:2018 concept in occupational safety and health risk management (K3) nuclear power plant site survey in West Kalimantan. This research arrangement qualitatively using primary data sources from FGD results for risk assessment of nuclear power plant site surveys and secondary data in the form of risk assessment rules from BATAN Standard (SB) 006-1:2019 Regarding OSH Risk Assessment. The results show that the concept of implementing ISO 45001:2018 can implement used PDCA (Plan-Do-Check-Act) cycle in risk management on 7 (seven) aspects: seismicity, volcanoes, meteorology, hydrology, geotechnical and foundation, human-caused events, population dispersion, and distribution. So that the flow of risk assessment stages and risk rating stages of the Nuclear Power Plant Site Survey identified as the risk is acceptable, not yet acceptable, and unacceptable. The results of the risk rating of one of the site survey samples, namely the seismic aspect, the results of the risk rating are acceptable.","PeriodicalId":340614,"journal":{"name":"Pertemuan dan Presentasi Ilmiah Standardisasi","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Pertemuan dan Presentasi Ilmiah Standardisasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31153/ppis.2021.123","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Occupational Health and Safety is a problem that has attracted the attention of many organizations because it problem in terms of human, economic, political, legal, responsibility, and image's organizational. The plan for a commercial-scale nuclear power plant to be built in West Kalimantan requires careful preparation. No exception during the site survey, because it must finish carefully. The nuclear power plant site survey obtains data and information for later evaluation and assessment of physical and non-physical conditions. A site survey carried out in a planned manner and supported by adequate infrastructure according to standards will produce data and information that can be ascertained. To support the activities of the nuclear power plant site survey to run smoothly, safely, and safely, it is necessary to apply the SNI ISO 45001:2018 concept in occupational safety and health risk management (K3) nuclear power plant site survey in West Kalimantan. This research arrangement qualitatively using primary data sources from FGD results for risk assessment of nuclear power plant site surveys and secondary data in the form of risk assessment rules from BATAN Standard (SB) 006-1:2019 Regarding OSH Risk Assessment. The results show that the concept of implementing ISO 45001:2018 can implement used PDCA (Plan-Do-Check-Act) cycle in risk management on 7 (seven) aspects: seismicity, volcanoes, meteorology, hydrology, geotechnical and foundation, human-caused events, population dispersion, and distribution. So that the flow of risk assessment stages and risk rating stages of the Nuclear Power Plant Site Survey identified as the risk is acceptable, not yet acceptable, and unacceptable. The results of the risk rating of one of the site survey samples, namely the seismic aspect, the results of the risk rating are acceptable.
采用ISO 45001:23 018的职业安全与健康风险管理(K3)研究西婆罗洲核电站位置的步骤的概念
职业健康与安全是一个涉及人的、经济的、政治的、法律的、责任的和组织形象的问题,引起了许多组织的关注。在西加里曼丹建造商业规模核电站的计划需要精心准备。现场勘测时也不例外,因为必须认真完成。核电站现场调查为以后的物理和非物理条件的评价和评价获取数据和信息。有计划地进行现场调查,并根据标准提供适当的基础设施,将产生可以确定的数据和信息。为了支持核电站现场调查活动顺利、安全、安全地进行,有必要在西加里曼丹的职业安全和健康风险管理(K3)核电站现场调查中应用SNI ISO 45001:2018概念。本研究定性地采用核电站现场调查烟气脱硫结果风险评估的一手数据来源和BATAN标准(SB) 006-1:2019关于职业安全与健康风险评估的风险评估规则形式的二次数据。结果表明,实施ISO 45001:2018的概念可以在7个方面的风险管理中实施PDCA(计划-执行-检查-行动)循环:地震活动性、火山、气象、水文、岩土和基础、人为事件、人口分散和分布。从而将流量风险评估阶段和风险评级阶段的核电站现场调查确定为风险可接受、尚不能接受和不可接受。该结果对其中一个现场调查样本进行了风险评级,即地震方面的风险评级结果是可以接受的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信