Cycle Time Approximations for the G/G/m Queue Subject to Server Failures and Cycle Time Offsets with Applications

J. R. Morrison, D.P. Martin
{"title":"Cycle Time Approximations for the G/G/m Queue Subject to Server Failures and Cycle Time Offsets with Applications","authors":"J. R. Morrison, D.P. Martin","doi":"10.1109/ASMC.2006.1638777","DOIUrl":null,"url":null,"abstract":"Approximate queueing formulae are often employed for the practical evaluation of manufacturing system performance. Common approximations do not fully address practical issues such as idle tools with work in queue, travel time between stages of production, removal of lots from queue pending process issue resolution and the tendency of lots to defect from a failed server in favor of an equivalent available server. In this paper, approximate queueing formulae are proposed which extend popular existing formulae. To test the quality of the proposed approximations, data from production toolsets in IBM's 200mm semiconductor manufacturing fabricator is considered. It is demonstrated that the approximations perform well on the toolsets studied","PeriodicalId":407645,"journal":{"name":"The 17th Annual SEMI/IEEE ASMC 2006 Conference","volume":" 22","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-05-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The 17th Annual SEMI/IEEE ASMC 2006 Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASMC.2006.1638777","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

Abstract

Approximate queueing formulae are often employed for the practical evaluation of manufacturing system performance. Common approximations do not fully address practical issues such as idle tools with work in queue, travel time between stages of production, removal of lots from queue pending process issue resolution and the tendency of lots to defect from a failed server in favor of an equivalent available server. In this paper, approximate queueing formulae are proposed which extend popular existing formulae. To test the quality of the proposed approximations, data from production toolsets in IBM's 200mm semiconductor manufacturing fabricator is considered. It is demonstrated that the approximations perform well on the toolsets studied
受服务器故障影响的G/G/m队列的周期时间近似和应用程序的周期时间偏移
在实际评价制造系统性能时,通常采用近似排队公式。常见的近似并不能完全解决实际问题,例如在队列中工作的空闲工具、生产阶段之间的行程时间、从队列中移除待解决的过程问题以及从故障服务器转向等效可用服务器的趋势。本文提出了一种近似的排队公式,推广了现有的常用排队公式。为了测试所提出的近似的质量,考虑了IBM的200mm半导体制造制造商的生产工具集的数据。结果表明,该近似方法在所研究的工具集上表现良好
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信