Development of Time-Cost Trade-Off model Based on Emergency Construction Work Scenario

Sihyun Lee, Seounghyun Lee, J. Son
{"title":"Development of Time-Cost Trade-Off model Based on Emergency Construction Work Scenario","authors":"Sihyun Lee, Seounghyun Lee, J. Son","doi":"10.6106/KJCEM.2016.17.3.043","DOIUrl":null,"url":null,"abstract":"Recently, the cost of construction projects has escalated due to a significant increase in size and complexity. Many construction projects have failed to meet their originally intended project deadline due to various factors such as weather, labor supply, equipment, procurement, accidents, etc. Consequently, emergency construction work scenario has to be implemented in order to shorten the duration and satisfy the original estimated schedule. However, many critical decisions in emergency scenario rely solely on the experience of a construction manager. Thus, this paper proposes TCTO optimization model to decide the most effective alternative out of various working scenarios which are generated by the combination of work group and work time. The developed TCTO model provides the optimum schedule that satisfies the practical constraints. Future research could involve the integration of resource leveling with the proposed model. This would make the model more versatile.","PeriodicalId":220018,"journal":{"name":"Korean Journal of Construction Engineering and Management","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Korean Journal of Construction Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.6106/KJCEM.2016.17.3.043","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Recently, the cost of construction projects has escalated due to a significant increase in size and complexity. Many construction projects have failed to meet their originally intended project deadline due to various factors such as weather, labor supply, equipment, procurement, accidents, etc. Consequently, emergency construction work scenario has to be implemented in order to shorten the duration and satisfy the original estimated schedule. However, many critical decisions in emergency scenario rely solely on the experience of a construction manager. Thus, this paper proposes TCTO optimization model to decide the most effective alternative out of various working scenarios which are generated by the combination of work group and work time. The developed TCTO model provides the optimum schedule that satisfies the practical constraints. Future research could involve the integration of resource leveling with the proposed model. This would make the model more versatile.
基于应急施工场景的时间成本权衡模型的建立
最近,由于规模和复杂性的显著增加,建筑项目的成本已经升级。由于天气、劳动力供应、设备、采购、事故等各种因素,许多建设项目未能按时完成原定的工期。因此,必须实施紧急施工方案,以缩短工期,满足原计划进度。然而,在紧急情况下,许多关键决策仅依赖于施工经理的经验。为此,本文提出了TCTO优化模型,从工作组和工作时间组合产生的各种工作场景中确定最有效的替代方案。所建立的TCTO模型提供了满足实际约束条件的最优调度方案。未来的研究可能涉及将资源均衡与所提出的模型相结合。这将使模型更加通用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信