{"title":"Cross-border redispatch as the remedial action and aspects of its implementation","authors":"Martin Jedinák, Stanislav Prieložný, F. Janiček, Juraj Kubica","doi":"10.1109/ELEKTRO.2016.7512086","DOIUrl":null,"url":null,"abstract":"Transmission system operators deal with situations when their system does not comply with N-1 criterion on daily basis. Remedial actions are any actions which the transmission system operator implements in due time to avert a critical situation. During the year some transmission elements reach the Maximum Permanent Current Loading, a situation which is unacceptable for the safety and reliable operation of the system. After exhausting of all non-cost possible actions it is necessary to consider the measures of market-technical kind, so called redispatch. Anticipated legislative changes, whether at European, national or internal level will extend system operator's possibilities of facing and managing a critical situation.","PeriodicalId":369251,"journal":{"name":"2016 ELEKTRO","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 ELEKTRO","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ELEKTRO.2016.7512086","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Transmission system operators deal with situations when their system does not comply with N-1 criterion on daily basis. Remedial actions are any actions which the transmission system operator implements in due time to avert a critical situation. During the year some transmission elements reach the Maximum Permanent Current Loading, a situation which is unacceptable for the safety and reliable operation of the system. After exhausting of all non-cost possible actions it is necessary to consider the measures of market-technical kind, so called redispatch. Anticipated legislative changes, whether at European, national or internal level will extend system operator's possibilities of facing and managing a critical situation.
作为补救行动的跨界重新派遣及其执行的各个方面
输电系统运营商每天都要处理系统不符合N-1标准的情况。补救措施是输电系统操作员在适当的时候为避免紧急情况而采取的任何措施。在一年中,一些输电元件达到了最大永久电流负载,这种情况对于系统的安全和可靠运行是不可接受的。在用尽所有可能的无成本行动之后,有必要考虑市场-技术类的措施,即所谓的再调度。无论是在欧洲、国家还是内部层面,预期的立法变化将扩大系统运营商面对和管理危急情况的可能性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信