Multi-Tenant Cloud-Edge Workflow Scheduling With Priority and Deadline Constraints

Dong Pan, Long Chen, Xiaoping Li
{"title":"Multi-Tenant Cloud-Edge Workflow Scheduling With Priority and Deadline Constraints","authors":"Dong Pan, Long Chen, Xiaoping Li","doi":"10.1109/services51467.2021.00048","DOIUrl":null,"url":null,"abstract":"The maximization of the Quality of Service (QoS) for multi-tenants is one of the key issues for cloud-edge service providers. Limited computing resources, different priorities, and deadlines of tenants make it difficult to satisfy the demands of all the multi-tenants. This paper considers the problem of scheduling limited cloud-edge resources to multi-tenant workflow applications with priority and deadline constraints. A level-based iterative greedy algorithm for the problem is proposed. The algorithm defines a priority-based multi-tenant instance success entropy to measure the total quality of service. The destruction & reconstruction and local search of the algorithm is performed based on the level of tasks. The proposed algorithm is compared to modified classical algorithms for similar problems. Experimental results demonstrate the effectiveness of the proposal for the considered problem.","PeriodicalId":210534,"journal":{"name":"2021 IEEE World Congress on Services (SERVICES)","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE World Congress on Services (SERVICES)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/services51467.2021.00048","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The maximization of the Quality of Service (QoS) for multi-tenants is one of the key issues for cloud-edge service providers. Limited computing resources, different priorities, and deadlines of tenants make it difficult to satisfy the demands of all the multi-tenants. This paper considers the problem of scheduling limited cloud-edge resources to multi-tenant workflow applications with priority and deadline constraints. A level-based iterative greedy algorithm for the problem is proposed. The algorithm defines a priority-based multi-tenant instance success entropy to measure the total quality of service. The destruction & reconstruction and local search of the algorithm is performed based on the level of tasks. The proposed algorithm is compared to modified classical algorithms for similar problems. Experimental results demonstrate the effectiveness of the proposal for the considered problem.
具有优先级和截止日期约束的多租户云边缘工作流调度
多租户服务质量(QoS)的最大化是云边缘服务提供商的关键问题之一。有限的计算资源、不同的优先级和租户的截止日期使得难以满足所有多租户的需求。本文研究了将有限的云边缘资源调度到具有优先级和截止日期约束的多租户工作流应用程序的问题。提出了一种基于层次的迭代贪心算法。该算法定义了一个基于优先级的多租户实例成功熵来衡量服务的总体质量。算法根据任务级别进行销毁重建和局部搜索。将该算法与同类问题的改进经典算法进行了比较。实验结果证明了该方法对所考虑问题的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信