utilization of Public-Private- Partnerships in schools

S. Kubaison
{"title":"utilization of Public-Private- Partnerships in schools","authors":"S. Kubaison","doi":"10.58506/ajstss.v1i2.18","DOIUrl":null,"url":null,"abstract":"This is a preliminary study on public-private partnerships in public secondary schools in Tigania west Sub-county.The  Objective of the study was to Investigate the models of public-private partnerships available in public secondary schools in Tigania West sub-county. The study was conducted in 46 public secondary schools between September and December 2021. The main data collection instruments comprised an observation checklist and  Interview schedules. School managers, KEPSA, and Ministry of Education officials provided interviews. Key findings include low levels of PPP intake in schools, poor performance in examinations, dilapidated infrastructure, under-utilization of certain facilities, lack of initiativeness by school managers, and lack of policy guide from MOE on implementation of PPPs in schools. The key PPP model preferred in schools was  Annuity payment, followed by PFI. The study recommends decentralization of PPP projects and authority in the education sector to aid school management benefit from the PPP Act of 2013.","PeriodicalId":440319,"journal":{"name":"African Journal of Science, Technology and Social Sciences","volume":"212 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"African Journal of Science, Technology and Social Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.58506/ajstss.v1i2.18","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This is a preliminary study on public-private partnerships in public secondary schools in Tigania west Sub-county.The  Objective of the study was to Investigate the models of public-private partnerships available in public secondary schools in Tigania West sub-county. The study was conducted in 46 public secondary schools between September and December 2021. The main data collection instruments comprised an observation checklist and  Interview schedules. School managers, KEPSA, and Ministry of Education officials provided interviews. Key findings include low levels of PPP intake in schools, poor performance in examinations, dilapidated infrastructure, under-utilization of certain facilities, lack of initiativeness by school managers, and lack of policy guide from MOE on implementation of PPPs in schools. The key PPP model preferred in schools was  Annuity payment, followed by PFI. The study recommends decentralization of PPP projects and authority in the education sector to aid school management benefit from the PPP Act of 2013.
在学校利用公私伙伴关系
本文是对蒂加尼亚西部副县公立中学公私伙伴关系的初步研究。本研究的目的是调查在蒂加尼亚西部副县的公立中学中可用的公私伙伴关系模式。该研究于2021年9月至12月在46所公立中学进行。主要的数据收集工具包括观察清单和访谈时间表。学校管理者、KEPSA和教育部官员接受了采访。主要发现包括学校对公私合作伙伴关系的接受程度低、考试成绩不佳、基础设施破旧、某些设施利用率低、学校管理者缺乏主动性,以及教育部在学校实施公私合作伙伴关系方面缺乏政策指导。学校首选的PPP模式主要是年金支付,其次是PFI。该研究建议在教育部门下放PPP项目和权力,以帮助学校管理从2013年的PPP法案中受益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信