Pengaruh virus corona (covid-19) terhadap ruas kinerja jalan disekitar pabrik GSI sukalarang

asti mirdianti, Paikun Paikun
{"title":"Pengaruh virus corona (covid-19) terhadap ruas kinerja jalan disekitar pabrik GSI sukalarang","authors":"asti mirdianti, Paikun Paikun","doi":"10.52005/TESLINK.V2I1.18","DOIUrl":null,"url":null,"abstract":"Since the factories began operating, they had an impact in the form of congestion that occurred on Jalan Sukabumi-Cianjur, precisely in front of the P.T. Glostar Indonesia (GSI) at the position of Km.13 until the new road access to PT. Pratama Abadi Industri. However, currently the world is in an uproar with a virus called Corona Virus or Covid-19 which has occurred in the last few months in Indonesia in 2020. Of course this will have an impact on all aspects including the level of road service, so a comparative study of road performance is made. around the GSI Sukalarang factory from Hatun 2017 to 2020. From the survey and calculation results, it can be concluded that the performance of roads with service levels in the current GSI factory area (2020) compared to the previous year (2017) at the same location has decreased which is indicated by reduced vehicle volume, vehicle speed. decreased, reduced vehicle density, and good service levels. From the data obtained, the Covid-19 Pandemic has an effect on traffic volume and road performance, resulting in a decrease in vehicle volume in 2020. In 2017 the traffic volume on Saturdays was 21684 vehicles and 8407.8 SMP / hour, for 2020 on Saturdays, namely 10471 vehicles and 5500.6 SMP / hour decreased by 48.3%. While in 2017 the traffic volume on Monday was 26430 vehicles and 9467.35 SMP / hour, for 2020 Monday, namely 23740 vehicles and 9623.85 SMP / hour decreased by 89.9%. \n ","PeriodicalId":263998,"journal":{"name":"Jurnal TESLINK : Teknik Sipil dan Lingkungan","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal TESLINK : Teknik Sipil dan Lingkungan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52005/TESLINK.V2I1.18","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Since the factories began operating, they had an impact in the form of congestion that occurred on Jalan Sukabumi-Cianjur, precisely in front of the P.T. Glostar Indonesia (GSI) at the position of Km.13 until the new road access to PT. Pratama Abadi Industri. However, currently the world is in an uproar with a virus called Corona Virus or Covid-19 which has occurred in the last few months in Indonesia in 2020. Of course this will have an impact on all aspects including the level of road service, so a comparative study of road performance is made. around the GSI Sukalarang factory from Hatun 2017 to 2020. From the survey and calculation results, it can be concluded that the performance of roads with service levels in the current GSI factory area (2020) compared to the previous year (2017) at the same location has decreased which is indicated by reduced vehicle volume, vehicle speed. decreased, reduced vehicle density, and good service levels. From the data obtained, the Covid-19 Pandemic has an effect on traffic volume and road performance, resulting in a decrease in vehicle volume in 2020. In 2017 the traffic volume on Saturdays was 21684 vehicles and 8407.8 SMP / hour, for 2020 on Saturdays, namely 10471 vehicles and 5500.6 SMP / hour decreased by 48.3%. While in 2017 the traffic volume on Monday was 26430 vehicles and 9467.35 SMP / hour, for 2020 Monday, namely 23740 vehicles and 9623.85 SMP / hour decreased by 89.9%.  
corona病毒(covid-19)对GSI sukaden加工厂周边街道工作的影响
自从工厂开始运营以来,它们在Jalan Sukabumi-Cianjur上造成了交通拥堵,就在印尼P.T. Glostar (GSI)的Km.13前面,直到通往PT. Pratama Abadi industries的新道路开通。然而,目前世界正因一种名为冠状病毒或Covid-19的病毒而一片哗然,这种病毒在过去几个月里于2020年在印度尼西亚发生。当然这会对包括道路服务水平在内的各个方面产生影响,所以对道路性能进行比较研究。从2017年到2020年,GSI苏卡拉朗工厂附近。从调查和计算结果可以看出,当前GSI工厂区域(2020年)的服务水平道路的性能与上一年(2017年)相比有所下降,这表现为车辆数量,车辆速度减少。车辆密度降低,服务水平良好。从获得的数据来看,2019冠状病毒病大流行对交通量和道路性能产生了影响,导致2020年车辆数量减少。2017年周六车流量为21684辆,8407.8 SMP /小时,2020年周六车流量为10471辆,5500.6 SMP /小时,减少48.3%。2017年周一车流量为26430辆,9467.35 SMP /小时,2020年周一车流量为23740辆,9623.85 SMP /小时,减少89.9%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信