{"title":"Safety of investment process parties in the aspect of construction work contract","authors":"Beata Grzyl, Emilia Miszewska-Urbańska, Agata Siemaszko","doi":"10.5604/01.3001.0010.7229","DOIUrl":null,"url":null,"abstract":"The essential characteristics of a construction investment project include, but are not limited to: individual, comprehensive, specialized, complex and multi-step nature of activities, significant time constraints, demand for different qualifications and resources (material, financial). The above characteristics are a potential source of risk, which makes it necessary to accurately describe the mutual relations of entities involved in the project primarily in the scope of the content of a construction work contract. Its task is to settle the commitments of the parties, their rights and obligations, and the responsibility for actions taken at the stage of preparation and implementation of the investment, in order to ensure its safe and non-conflicting realization. Signing a construction work contract results in the assumption of specific responsibilities by each party. In practice there are numerous examples of contractual clauses, which constitute a gross violation of the safety and balance of the parties in the area of fair and even distribution of potential risk. Most often two groups of contractual provisions are observed in the content of works contracts. The first one contains an unreasonable limitation of the contractor's entitlements, the other includes the irrational extension of the contractor's obligations and the transfer of numerous consequences of potential risks. The incorrect, i.e. unequal division of risk and its consequences is the most common cause of disputes between parties to a construction work contract. The paper presents the issue of asymmetry in the allocation of risks and limitations in shaping the contents of the public procurement contract, in terms of the safety of parties to construction work contracts","PeriodicalId":233227,"journal":{"name":"Journal of Science of the Gen. Tadeusz Kosciuszko Military Academy of Land Forces","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-10-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Science of the Gen. Tadeusz Kosciuszko Military Academy of Land Forces","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5604/01.3001.0010.7229","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

The essential characteristics of a construction investment project include, but are not limited to: individual, comprehensive, specialized, complex and multi-step nature of activities, significant time constraints, demand for different qualifications and resources (material, financial). The above characteristics are a potential source of risk, which makes it necessary to accurately describe the mutual relations of entities involved in the project primarily in the scope of the content of a construction work contract. Its task is to settle the commitments of the parties, their rights and obligations, and the responsibility for actions taken at the stage of preparation and implementation of the investment, in order to ensure its safe and non-conflicting realization. Signing a construction work contract results in the assumption of specific responsibilities by each party. In practice there are numerous examples of contractual clauses, which constitute a gross violation of the safety and balance of the parties in the area of fair and even distribution of potential risk. Most often two groups of contractual provisions are observed in the content of works contracts. The first one contains an unreasonable limitation of the contractor's entitlements, the other includes the irrational extension of the contractor's obligations and the transfer of numerous consequences of potential risks. The incorrect, i.e. unequal division of risk and its consequences is the most common cause of disputes between parties to a construction work contract. The paper presents the issue of asymmetry in the allocation of risks and limitations in shaping the contents of the public procurement contract, in terms of the safety of parties to construction work contracts
建设工程承包方面投资过程当事人的安全
建设投资项目的基本特征包括但不限于:活动的个体性、综合性、专门性、复杂性和多步骤性、显著的时间限制、对不同资质和资源(物力、财力)的需求。上述特点是潜在的风险来源,因此有必要在建筑工程合同的内容范围内,首先准确描述项目所涉及的实体之间的相互关系。其任务是确定各方的承诺、其权利和义务以及在准备和实施投资阶段所采取行动的责任,以确保投资的安全和无冲突地实现。签订建筑工程合同意味着双方承担具体的责任。在实践中,有许多合同条款的例子,这些条款严重违反了双方在公平和均匀分配潜在风险方面的安全和平衡。在工程合同的内容中,通常有两组合同条款。前者包括对承包商权利的不合理限制,后者包括承包商义务的不合理延伸和潜在风险的众多后果的转移。不正确的,即不平等的风险划分及其后果是建筑工程合同各方之间发生纠纷的最常见原因。本文从建筑工程合同各方的安全角度出发,提出了风险分配的不对称问题和公共采购合同内容塑造的局限性
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信