Unlocking Subsurface Hidden Potential in Tempino Mature Field: Opportunity and Challenge

R. Rahadian
{"title":"Unlocking Subsurface Hidden Potential in Tempino Mature Field: Opportunity and Challenge","authors":"R. Rahadian","doi":"10.29118/ipa22-e-233","DOIUrl":null,"url":null,"abstract":"Tempino structure is one of the brownfield structures in Jambi. Air Benakat and Gumai Formation have been producing hydrocarbon since 1920s and currently the Tempino structure contributes about 900 BOPD to the oil production of Jambi Field. There are 218 wells in Tempino before the success of drilling T-219 well in 2021. The T-219 well produced more than 400 BOPD from the Gumai Formation as confirmed the hydrocarbon potential in central block, to be followed by 7 approved-wells proposed to be drilled in 2022-2023, a most aggressive activity in Tempino in the last 20 years. Only about 13 wells of Tempino’s wells penetrated the Gumai Formation. The drawback in assessing subsurface was due to data (availability, quality, and comprehensiveness) to the production analogue, as there was no particular problem with the reservoir distribution. Three simple ideas of well profile mapping, selective layer perforation method, and fracturing design are lessons learned from many wells whose performance was not as expected, ideas which were then implemented in T-219 wells. The data acquisition result of T-219 well was surprisingly indicating that the Gumai sand had oil occurrence, near virgin formation pressure, and around 20 meters shallower than estimated. The updated static and dynamic model showed a significant change to the previous model, as vertical seismic profiling (VSP) and pressure test data played a massive role. The latest model shows great potential of central block of Tempino, where T-219 well was placed. In contrast to the T-219 well, it is assumed that the following wells will have better properties and the production forecast with low uncertainty case. On the other hand, there is still a big question to be answered, as more than 100 meters of Gumai sand is considered to have vertical barrier as the porosity log shows several streaks of more-dense materials in the midst of the sand. When this question is resolved, the Gumai sand in Tempino will probably have a bigger estimate of hydrocarbon potential. The Lessons learned of this success story in discovering hydrocarbon in a mature field is to implement a novel approach and learn from the ideas of previous well proposals.","PeriodicalId":442360,"journal":{"name":"Proceedings of Indonesian Petroleum Association, 46th Annual Convention & Exhibition, 2022","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Indonesian Petroleum Association, 46th Annual Convention & Exhibition, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29118/ipa22-e-233","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Tempino structure is one of the brownfield structures in Jambi. Air Benakat and Gumai Formation have been producing hydrocarbon since 1920s and currently the Tempino structure contributes about 900 BOPD to the oil production of Jambi Field. There are 218 wells in Tempino before the success of drilling T-219 well in 2021. The T-219 well produced more than 400 BOPD from the Gumai Formation as confirmed the hydrocarbon potential in central block, to be followed by 7 approved-wells proposed to be drilled in 2022-2023, a most aggressive activity in Tempino in the last 20 years. Only about 13 wells of Tempino’s wells penetrated the Gumai Formation. The drawback in assessing subsurface was due to data (availability, quality, and comprehensiveness) to the production analogue, as there was no particular problem with the reservoir distribution. Three simple ideas of well profile mapping, selective layer perforation method, and fracturing design are lessons learned from many wells whose performance was not as expected, ideas which were then implemented in T-219 wells. The data acquisition result of T-219 well was surprisingly indicating that the Gumai sand had oil occurrence, near virgin formation pressure, and around 20 meters shallower than estimated. The updated static and dynamic model showed a significant change to the previous model, as vertical seismic profiling (VSP) and pressure test data played a massive role. The latest model shows great potential of central block of Tempino, where T-219 well was placed. In contrast to the T-219 well, it is assumed that the following wells will have better properties and the production forecast with low uncertainty case. On the other hand, there is still a big question to be answered, as more than 100 meters of Gumai sand is considered to have vertical barrier as the porosity log shows several streaks of more-dense materials in the midst of the sand. When this question is resolved, the Gumai sand in Tempino will probably have a bigger estimate of hydrocarbon potential. The Lessons learned of this success story in discovering hydrocarbon in a mature field is to implement a novel approach and learn from the ideas of previous well proposals.
打开Tempino成熟油田地下隐藏潜力:机遇与挑战
Tempino结构是占碑的棕地结构之一。Air Benakat和Gumai地层自20世纪20年代以来一直在生产油气,目前Tempino构造为Jambi油田贡献了约900桶/天的石油产量。在2021年成功钻探T-219井之前,Tempino有218口井。T-219井在Gumai组的产量超过400桶/天,证实了中心区块的油气潜力,随后将有7口井批准在2022-2023年钻探,这是Tempino过去20年来最积极的活动。在Tempino公司的油井中,只有大约13口井穿透了古迈地层。由于储层分布没有特别的问题,地下评估的缺点是由于生产模拟的数据(可用性、质量和全面性)。井廓图作图、选择层射孔方法和压裂设计这三个简单的想法是从许多井中吸取的经验教训,这些井的性能不如预期,然后在T-219井中得到了应用。T-219井的数据采集结果令人惊讶地表明,古麦砂层有产油,地层压力接近原始地层,且比预估浅约20米。由于垂直地震剖面(VSP)和压力测试数据发挥了巨大的作用,更新后的静态和动态模型与之前的模型发生了重大变化。最新模型显示T-219井所在的Tempino中部区块潜力巨大。与T-219井相比,假设后续井具有更好的物性和低不确定性的产量预测。另一方面,由于孔隙度测井显示沙子中间有几条密度更大的物质条纹,因此超过100米的古麦砂被认为存在垂直屏障,这仍然是一个有待回答的大问题。当这个问题得到解决时,Tempino的Gumai砂可能会有更大的油气潜力估计。在成熟油田成功发现油气的经验教训是,采用一种新颖的方法,并从以前的井方案中吸取教训。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信