Problematika priključenja vetroelektrana na prenosnu mrežu EMS ad

Saša Zdravković, Milan Blažić, Branko Šumonja, Marija Đorđević, Julijana Vićovac, Nebojša Đurin
{"title":"Problematika priključenja vetroelektrana na prenosnu mrežu EMS ad","authors":"Saša Zdravković, Milan Blažić, Branko Šumonja, Marija Đorđević, Julijana Vićovac, Nebojša Đurin","doi":"10.46793/eee20-1-2.044z","DOIUrl":null,"url":null,"abstract":"in 2018 the first connections of wind farms to the transmission network EMS have been realized. In a short period of time, the total of four (4) wind farms were put into operation and, therefore, with engaging a lot of employees, it was necessary to modify and adapt a number of procedures and regulations in order to conclude all the Wind Energy Exploitation Agreements. Due to the stochasticity of the wind phenomenon, the forecast of wind farm production and its relation to the achieved energy production shall be addressed. As the employees of JSC EMS meet for the first time with this type of production capacities, the paper contains real data on meteorological parameters that influence the production of electricity from wind farms. Since all four (4) wind farms are located in the same geographical area, their impact on power flows, operational planning and balancing of the electrical power system shall be analyzed.","PeriodicalId":236996,"journal":{"name":"Energija, ekonomija, ekologija","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energija, ekonomija, ekologija","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46793/eee20-1-2.044z","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

in 2018 the first connections of wind farms to the transmission network EMS have been realized. In a short period of time, the total of four (4) wind farms were put into operation and, therefore, with engaging a lot of employees, it was necessary to modify and adapt a number of procedures and regulations in order to conclude all the Wind Energy Exploitation Agreements. Due to the stochasticity of the wind phenomenon, the forecast of wind farm production and its relation to the achieved energy production shall be addressed. As the employees of JSC EMS meet for the first time with this type of production capacities, the paper contains real data on meteorological parameters that influence the production of electricity from wind farms. Since all four (4) wind farms are located in the same geographical area, their impact on power flows, operational planning and balancing of the electrical power system shall be analyzed.
2018年,首次实现了风电场与输电网络EMS的连接。在很短的时间内,总共有四(4)个风电场投入运行,因此,需要大量的员工,有必要修改和调整一些程序和法规,以完成所有的风能开发协议。由于风现象的随机性,需要解决风电场产量的预测及其与实现发电量的关系。由于JSC EMS的员工第一次接触到这种生产能力,因此本文包含了影响风电场发电的气象参数的真实数据。由于所有4个风电场位于同一地理区域,因此需要分析它们对电力系统潮流、运行规划和平衡的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信