{"title":"The Management of Engineering Changes Using the Primus System","authors":"Felix P. Mallmann","doi":"10.1145/800139.804555","DOIUrl":null,"url":null,"abstract":"During the development of electronic products, engineering changes cannot normally be avoided. An effective method of handling EC's using the PRIMUS system is described. The basic features are a central database used in interactive mode and the possibility of storing all states of a design at the same time. The increase of data is by about 10%, but the savings in computer time are more than 50% in the design correction loops.","PeriodicalId":196513,"journal":{"name":"17th Design Automation Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1980-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"17th Design Automation Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/800139.804555","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
During the development of electronic products, engineering changes cannot normally be avoided. An effective method of handling EC's using the PRIMUS system is described. The basic features are a central database used in interactive mode and the possibility of storing all states of a design at the same time. The increase of data is by about 10%, but the savings in computer time are more than 50% in the design correction loops.