Critical assessment of ERTMS systems reliability based on the example of the GSM-R system

M. Siergiejczyk
{"title":"Critical assessment of ERTMS systems reliability based on the example of the GSM-R system","authors":"M. Siergiejczyk","doi":"10.5604/12314005.1217282","DOIUrl":null,"url":null,"abstract":"It can be assumed that at least some of the systems associated with the train traffic operation work in the “mission” mode, i.e. their availability and operational dependability are related to safe “move” of a train through the strictly defined section of the railway line, i.e. systems (devices) must operate reliably during “mission”. In the remaining time, operation of devices does not affect the safe train traffic operation. For example, it is possible to list crossing signalling systems or the GSM-R system, which along with the ETCS 2/3 system, constitutes the ERTMS","PeriodicalId":165563,"journal":{"name":"Journal of KONES. Powertrain and Transport","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of KONES. Powertrain and Transport","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5604/12314005.1217282","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

It can be assumed that at least some of the systems associated with the train traffic operation work in the “mission” mode, i.e. their availability and operational dependability are related to safe “move” of a train through the strictly defined section of the railway line, i.e. systems (devices) must operate reliably during “mission”. In the remaining time, operation of devices does not affect the safe train traffic operation. For example, it is possible to list crossing signalling systems or the GSM-R system, which along with the ETCS 2/3 system, constitutes the ERTMS
基于GSM-R系统实例的ERTMS系统可靠性关键评估
可以假设,与列车交通运行相关的系统至少有一部分是在“任务”模式下工作的,即它们的可用性和运行可靠性与列车在严格定义的铁路线上的安全“移动”有关,即系统(设备)在“任务”期间必须可靠地运行。在剩余时间内,设备运行不影响列车安全交通运行。例如,可以列出交叉信号系统或GSM-R系统,它们与ETCS 2/3系统一起构成ERTMS
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信