D. M. Pop, H. Ardelean, N. Chiosa, S. Kilyeni, G. Vuc, C. Barbulescu
{"title":"Analysis of contingencies considering the new 400 kV axle administrated by Timisoara transmission branch","authors":"D. M. Pop, H. Ardelean, N. Chiosa, S. Kilyeni, G. Vuc, C. Barbulescu","doi":"10.1109/HSI.2008.4581501","DOIUrl":null,"url":null,"abstract":"The paper presents the modifications made in comparison with the actual functioning pattern which is part of the subsystem in the Western and South-Western area of the Romanian power system, the Winter-Evening-Peak regime. The 400 kV electrical line Portile de Fier-Resita was introduced, the transition of the electrical lines Resita-Timisoara and Timisoara-Sacalaz-Arad from 220 kV to 400 kV was made; these lines previously operated as 220 kV lines. The 400 kV electrical lines Oradea-Nadab-Bekescsba and Arad-Nadab-Bekescsaba were also introduced to. We tried to identify a series of specific regimes which are representative for the problems raised by the reactive power flow and by the voltage level. Simple contingencies of N-1 type referring to all elements of the power system for the basic regime have been analyzed as well as double contingencies of N-2 type.","PeriodicalId":139846,"journal":{"name":"2008 Conference on Human System Interactions","volume":"107 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 Conference on Human System Interactions","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HSI.2008.4581501","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
The paper presents the modifications made in comparison with the actual functioning pattern which is part of the subsystem in the Western and South-Western area of the Romanian power system, the Winter-Evening-Peak regime. The 400 kV electrical line Portile de Fier-Resita was introduced, the transition of the electrical lines Resita-Timisoara and Timisoara-Sacalaz-Arad from 220 kV to 400 kV was made; these lines previously operated as 220 kV lines. The 400 kV electrical lines Oradea-Nadab-Bekescsba and Arad-Nadab-Bekescsaba were also introduced to. We tried to identify a series of specific regimes which are representative for the problems raised by the reactive power flow and by the voltage level. Simple contingencies of N-1 type referring to all elements of the power system for the basic regime have been analyzed as well as double contingencies of N-2 type.
本文介绍了罗马尼亚电力系统西部和西南地区冬季晚峰制度分系统的实际运行模式,并与实际运行模式进行了比较。介绍了400千伏的Portile de fiire - resita输电线路,将Resita-Timisoara和Timisoara-Sacalaz-Arad输电线路从220千伏过渡到400千伏;这些线路以前以220千伏线路运行。还介绍了400千伏的奥拉迪亚-那达布-贝kescsba和阿拉德-那达布-贝kescsba电力线路。我们试图确定一系列具体的制度,这些制度代表了由无功功率流和电压水平引起的问题。分析了N-1型的简单偶然性,即电力系统的所有要素,以及N-2型的双偶然性。