11. Building and Resources

{"title":"11. Building and Resources","authors":"","doi":"10.1177/0962144x21994428","DOIUrl":null,"url":null,"abstract":"Introduction 11-03 How practice premises are financed 11-03 Provided by the local authority or PCO (health centres) 11-03 Rented premises – leasehold rent reimbursement 11-04 Doctor-owned premises – notional rent and cost rent 11-05 NHS LIFT (England only) 11-05 Private finance 11-06 Improvement grants 11-06 Fundraising 11-07 Financing new premises in Wales and Scotland 11-07 Accommodation 11-07 Consulting rooms 11-07 Waiting area 11-08 Music in the waiting room 11-08 Reception area 11-08 Telephone/receptionist administration area 11-08 Practice manager and administration area 11-09 IT and telephones 11-09 Meeting rooms, coffee rooms, libraries 11-09 Toilet facilities 11-09 Disposal of waste 11-09 Storage 11-09 Prams and buggies 11-09 Parking 11-09 Other 11-10 Room sharing and hot-desking 11-10 Hot-desking 11-11 Smokefree practices 11-11 Access to practice premises for disabled people 11-11 The Equality Act 2010 11-12 Definition of disability 11-12 How does the The Equality Act 2010 apply to general practice? 11-12 What action can a disabled person take? 11-13 Building regulations and access for disabled patients 11-13 Building a new surgery 11-13 Defining the existing problems 11-13 Speaking to the PCO 11-14 Finding your architect 11-14 Briefing your architect 11-14 Feasibility 11-14 Land and building acquisition 11-15 Outline proposals 11-16 Scheme design 11-16 Planning application 11-16 Detail design 11-17 Involving staff 11-17 Involving patients 11-18 Production information 11-18 Tender action 11-19 Project planning 11-19 Operations on site 11-20 Completion 11-20 Moving premises 11-21 In advance 11-21 Moving day 11-21 Re-establishing normal service 11-22 When things are settling down 11-22 Property maintenance 11-22 The elements of maintenance 11-23 Main fabric items 11-23 Roofing 11-23 Flooring 11-24 Redecoration 11-24 Electrical 11-24 Heating, ventilation and air-conditioning 11-24 Telecommunications 11-25 Mechanical handling 11-25 Equipment 11-25 Types of maintenance 11-25 Contract maintenance 11-25 Emergency maintenance 11-26 Planned maintenance 11-26 Alterations 11-26 Fire audit 11-26 Responsibility for maintenance 11-26 The contractor 11-27 Sub-contractors 11-27 Payment 11-27 Sinking fund 11-27 Manager’s maintenance checklist 11-27 Fire safety precautions 11-28 Risk assessment 11-28 Escape routes 11-29 Fire extinguishers 11-29 Evacuation 11-29 Fire prevention 11-29 Fire alarms 11-29 Practice fire team 11-30 Fire drill 11-30 Model fire drill instructions 11-31 Practice security 11-3","PeriodicalId":413688,"journal":{"name":"Handbook of Practice Management","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Handbook of Practice Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/0962144x21994428","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Introduction 11-03 How practice premises are financed 11-03 Provided by the local authority or PCO (health centres) 11-03 Rented premises – leasehold rent reimbursement 11-04 Doctor-owned premises – notional rent and cost rent 11-05 NHS LIFT (England only) 11-05 Private finance 11-06 Improvement grants 11-06 Fundraising 11-07 Financing new premises in Wales and Scotland 11-07 Accommodation 11-07 Consulting rooms 11-07 Waiting area 11-08 Music in the waiting room 11-08 Reception area 11-08 Telephone/receptionist administration area 11-08 Practice manager and administration area 11-09 IT and telephones 11-09 Meeting rooms, coffee rooms, libraries 11-09 Toilet facilities 11-09 Disposal of waste 11-09 Storage 11-09 Prams and buggies 11-09 Parking 11-09 Other 11-10 Room sharing and hot-desking 11-10 Hot-desking 11-11 Smokefree practices 11-11 Access to practice premises for disabled people 11-11 The Equality Act 2010 11-12 Definition of disability 11-12 How does the The Equality Act 2010 apply to general practice? 11-12 What action can a disabled person take? 11-13 Building regulations and access for disabled patients 11-13 Building a new surgery 11-13 Defining the existing problems 11-13 Speaking to the PCO 11-14 Finding your architect 11-14 Briefing your architect 11-14 Feasibility 11-14 Land and building acquisition 11-15 Outline proposals 11-16 Scheme design 11-16 Planning application 11-16 Detail design 11-17 Involving staff 11-17 Involving patients 11-18 Production information 11-18 Tender action 11-19 Project planning 11-19 Operations on site 11-20 Completion 11-20 Moving premises 11-21 In advance 11-21 Moving day 11-21 Re-establishing normal service 11-22 When things are settling down 11-22 Property maintenance 11-22 The elements of maintenance 11-23 Main fabric items 11-23 Roofing 11-23 Flooring 11-24 Redecoration 11-24 Electrical 11-24 Heating, ventilation and air-conditioning 11-24 Telecommunications 11-25 Mechanical handling 11-25 Equipment 11-25 Types of maintenance 11-25 Contract maintenance 11-25 Emergency maintenance 11-26 Planned maintenance 11-26 Alterations 11-26 Fire audit 11-26 Responsibility for maintenance 11-26 The contractor 11-27 Sub-contractors 11-27 Payment 11-27 Sinking fund 11-27 Manager’s maintenance checklist 11-27 Fire safety precautions 11-28 Risk assessment 11-28 Escape routes 11-29 Fire extinguishers 11-29 Evacuation 11-29 Fire prevention 11-29 Fire alarms 11-29 Practice fire team 11-30 Fire drill 11-30 Model fire drill instructions 11-31 Practice security 11-3
11. 建筑及资源
导言11-03执业场所如何融资11-03由地方当局或PCO(健康中心)提供11-03租赁场所-租赁租金报销11-04医生拥有的场所-名义租金和成本租金11-05 NHS LIFT(仅限英格兰)11-05私人融资11-06改善赠款11-06筹款11-07威尔士和苏格兰新场所融资11-07住宿11-07咨询室11-07等候区11-08等候室音乐11-08接待区11-08电话/前台管理区11-08实习经理及管理区11-09 IT及电话11-09会议室、咖啡厅、图书馆11-09厕所设施11-09废物处理11-09储存11-09婴儿车11-09停车11-09其他11-10共用房间和共用办公桌11-10共用办公桌11-11无烟做法11-11残疾人进入练习场所11-11 2010年平等法案11-12残疾定义11-12 2010年平等法案如何适用于一般实践?残疾人可以采取什么行动?11-13建筑法规和残疾患者通道11-13新建手术室11-13确定现有问题11-13与PCO沟通11-14寻找建筑师11-14向建筑师介绍11-14可行性11-14土地和建筑物购置11-15大纲建议11-16方案设计11-16规划申请11-16详细设计11-17涉及员工11-17涉及患者11-18生产信息11-18招标行动11-19项目规划11-19现场操作11-20完工11-20搬家11-21提前11-21搬家日11-21恢复正常服务11-22一切尘埃落定11-22物业维护11-22维护要素11-23主要织物项目11-23屋面11-23地板11-24重新装修11-24电气11-24采暖通风与空调11-24电信11-25机械搬运11-25设备11-25维护类型11-25合同维护11-25应急维护11-26计划维护11-26变更11-26消防审计11-26维护责任11-26承包商11-27分包商11-27付款11-27偿债基金11-27经理维护清单11-27消防安全注意事项11-28风险评估11-28逃生路线11-29灭火器11-29疏散11-29防火11-29火警11-29消防队演练11-30消防演练11-30消防演练示范说明11-31安全演练11-3
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书