Conflicts between Main Contractor and Domestic Sub-Contractors in the Building Projects in Tanzania; Experiences and Causes

Suzana P. Magazi, Geraldine J. Kikwasi
{"title":"Conflicts between Main Contractor and Domestic Sub-Contractors in the Building Projects in Tanzania; Experiences and Causes","authors":"Suzana P. Magazi, Geraldine J. Kikwasi","doi":"10.31033/ijemr.12.3.6","DOIUrl":null,"url":null,"abstract":"Conflicts are unavoidable in the projects; there is no project that is free from conflicts. At the same time, sub-contracting has been, and continues to be a very important aspect in building construction industry, as standard procedure in construction. Thus, the study aims at analyzing the conflicts between main contractor and domestic sub-contractors in building construction projects in Tanzania. Qualitative and quantitative approaches were employed in this research. Data was collected using questionnaires. A total of 38 questionnaires were distributed to building construction and domestic sub-contractors found in Dar-es-Salaam, and 32 were returned fairly filled for analysis accounting to 84.2%. On the experience in terms of the connection between main and sub-contractor; findings revealed 81.3% their relationship to be good. 43.8% said yes to have ever been in a project that did not go well because of problems between main and sub-contractor, while 53.1% said “no”. Moreover, on whether the project contract prepared are to each party specifications and satisfaction; 84.4% of the respondents said sometimes. In terms of the availability of a penalty clause in the project contract, if one of the parties fails to comply; 56.3% of the respondents said sometimes. 40.6% of the respondents said the payment is normally done immediately after completion. Furthermore, 75.0% said the contract is prepared by the main contractor. Besides, findings revealed PPRA as the most used form of sub-contract by 56.3% respondents. Additionally, 65.5% of the respondents have had a share of conflicts, either as a main contractor against a sub-contractor, or as a sub-contractor against a main contractor. Also, some respondents revealed, failing to follow instruction, delaying in materials delivery to site, poor quality of work, as well as main contractor’s squeezing them firmly on the quoted prices, leaving them fighting to make ends meet, alongside experiencing huge loses; as the main areas sparking the conflicts. Finally,69.6% reported the extent of occurrences of conflicts in Tanzanian building construction industry to be frequently. Moreover, Findings revealed delays in payment, poor communication, lack of trust, consultants delay in approving work and sample material, and shortage of construction materials in the market as well as unexpected price escalations are the factors with the highest frequency in causing conflicts. The study concludes that for the project to run smoothly and with less conflicts, proper attention must be paid to all recommendations such as good communication, cooperation and timely payment; early notice and proper records keeping; sub-contractor should have enough fund for project; certify work on time and timely payment; and risk management plan.","PeriodicalId":421022,"journal":{"name":"International Journal of Engineering and Management Research","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Engineering and Management Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31033/ijemr.12.3.6","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Conflicts are unavoidable in the projects; there is no project that is free from conflicts. At the same time, sub-contracting has been, and continues to be a very important aspect in building construction industry, as standard procedure in construction. Thus, the study aims at analyzing the conflicts between main contractor and domestic sub-contractors in building construction projects in Tanzania. Qualitative and quantitative approaches were employed in this research. Data was collected using questionnaires. A total of 38 questionnaires were distributed to building construction and domestic sub-contractors found in Dar-es-Salaam, and 32 were returned fairly filled for analysis accounting to 84.2%. On the experience in terms of the connection between main and sub-contractor; findings revealed 81.3% their relationship to be good. 43.8% said yes to have ever been in a project that did not go well because of problems between main and sub-contractor, while 53.1% said “no”. Moreover, on whether the project contract prepared are to each party specifications and satisfaction; 84.4% of the respondents said sometimes. In terms of the availability of a penalty clause in the project contract, if one of the parties fails to comply; 56.3% of the respondents said sometimes. 40.6% of the respondents said the payment is normally done immediately after completion. Furthermore, 75.0% said the contract is prepared by the main contractor. Besides, findings revealed PPRA as the most used form of sub-contract by 56.3% respondents. Additionally, 65.5% of the respondents have had a share of conflicts, either as a main contractor against a sub-contractor, or as a sub-contractor against a main contractor. Also, some respondents revealed, failing to follow instruction, delaying in materials delivery to site, poor quality of work, as well as main contractor’s squeezing them firmly on the quoted prices, leaving them fighting to make ends meet, alongside experiencing huge loses; as the main areas sparking the conflicts. Finally,69.6% reported the extent of occurrences of conflicts in Tanzanian building construction industry to be frequently. Moreover, Findings revealed delays in payment, poor communication, lack of trust, consultants delay in approving work and sample material, and shortage of construction materials in the market as well as unexpected price escalations are the factors with the highest frequency in causing conflicts. The study concludes that for the project to run smoothly and with less conflicts, proper attention must be paid to all recommendations such as good communication, cooperation and timely payment; early notice and proper records keeping; sub-contractor should have enough fund for project; certify work on time and timely payment; and risk management plan.
坦桑尼亚建筑工程中总承包商与国内分包商的冲突经历与原因
在项目中冲突是不可避免的;没有一个项目是没有冲突的。与此同时,作为建筑施工的标准程序,分包已经并将继续成为建筑行业的一个非常重要的方面。因此,本研究旨在分析坦桑尼亚建筑工程中总承包商与国内分包商之间的冲突。本研究采用定性与定量相结合的方法。通过问卷调查收集数据。共向达累斯萨拉姆的建筑施工和国内分包商发放了38份问卷,其中32份问卷公平填写,占84.2%。论主分包商对接的经验调查结果显示,81.3%的人认为他们的关系是好的。43.8%的受访者表示曾参与过因主承包商和分包商之间的问题而导致项目进展不顺利的项目,53.1%的受访者表示没有。再者,对所编制的工程合同是否使各方规范和满意;84.4%的人回答“有时”。在项目合同的处罚条款方面,如果一方不遵守;56.3%的人回答“有时”。40.6%的受访者表示,通常在完工后立即付款。此外,75.0%的人表示合同是由总承包商准备的。此外,调查结果显示,PPRA是最常用的分包形式,占56.3%的受访者。此外,65.5%的受访者有过作为总承包商与分包商的冲突,或作为分包商与总承包商的冲突。此外,部分受访企业反映,施工过程中不按要求执行、材料交付延迟、施工质量不佳,以及总包商对其报价的严格压榨,使其入不敷出,损失巨大;作为引发冲突的主要地区。最后,69.6%的人报告说,坦桑尼亚建筑业发生冲突的程度经常。此外,调查结果显示,延迟付款、沟通不畅、缺乏信任、顾问延迟批准工作和样品材料、市场上建筑材料短缺以及价格意外上涨是引发冲突的最高频率因素。研究认为,要使项目顺利进行,减少冲突,必须重视沟通、配合、及时付款等各项建议;尽早通知并妥善保存记录;分包商应有足够的项目资金;保证工作按时完成并及时付款;以及风险管理计划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信