R. Zeinali, H. Siahkali, M. Amelian, H. Alriyami, A. Sinha, G. Kulkarni
{"title":"Main criteria in interconnection of generating units to islanded grids, Salalah IPP2 case study","authors":"R. Zeinali, H. Siahkali, M. Amelian, H. Alriyami, A. Sinha, G. Kulkarni","doi":"10.1109/IEEEGCC.2015.7060080","DOIUrl":null,"url":null,"abstract":"In each islanded grids, a number of technical rules and recommendations need to be followed in operation ensuring smooth operation of the system and to enable grid disturbances to be controlled. These technical rules and recommendations, however, give the operators the option of going beyond mere compliance with these minimum requirements, implementing more stringent requirements or even defining these in details. In this paper, main criteria and rules, which should be considered in interconnection power plants to the islanded grids, are reviewed. One of the criteria, that is a main concern of system planners and operators, is frequency deviation limits and required spinning reserve to diminish it. In this paper, as a case study, technical criteria in Power evacuation system of IPP12 power plant to Salalah grid (DPC, Oman) are discussed.","PeriodicalId":127217,"journal":{"name":"2015 IEEE 8th GCC Conference & Exhibition","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-03-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE 8th GCC Conference & Exhibition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEEGCC.2015.7060080","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In each islanded grids, a number of technical rules and recommendations need to be followed in operation ensuring smooth operation of the system and to enable grid disturbances to be controlled. These technical rules and recommendations, however, give the operators the option of going beyond mere compliance with these minimum requirements, implementing more stringent requirements or even defining these in details. In this paper, main criteria and rules, which should be considered in interconnection power plants to the islanded grids, are reviewed. One of the criteria, that is a main concern of system planners and operators, is frequency deviation limits and required spinning reserve to diminish it. In this paper, as a case study, technical criteria in Power evacuation system of IPP12 power plant to Salalah grid (DPC, Oman) are discussed.
在每个孤岛电网中,在运行中需要遵循一些技术规则和建议,以确保系统的平稳运行,并使电网干扰得到控制。然而,这些技术规则和建议为运营商提供了超越这些最低要求的选择,实施更严格的要求,甚至详细定义这些要求。本文综述了电厂与孤岛电网并网时应考虑的主要准则和规则。其中一个标准,这是主要关注的系统规划者和运营商,是频率偏差限制和所需的旋转储备,以减少它。本文以阿曼萨拉拉电网(DPC, Oman Salalah)为例,探讨了IPP12电厂电力疏散系统的技术标准。