Main criteria in interconnection of generating units to islanded grids, Salalah IPP2 case study

R. Zeinali, H. Siahkali, M. Amelian, H. Alriyami, A. Sinha, G. Kulkarni
{"title":"Main criteria in interconnection of generating units to islanded grids, Salalah IPP2 case study","authors":"R. Zeinali, H. Siahkali, M. Amelian, H. Alriyami, A. Sinha, G. Kulkarni","doi":"10.1109/IEEEGCC.2015.7060080","DOIUrl":null,"url":null,"abstract":"In each islanded grids, a number of technical rules and recommendations need to be followed in operation ensuring smooth operation of the system and to enable grid disturbances to be controlled. These technical rules and recommendations, however, give the operators the option of going beyond mere compliance with these minimum requirements, implementing more stringent requirements or even defining these in details. In this paper, main criteria and rules, which should be considered in interconnection power plants to the islanded grids, are reviewed. One of the criteria, that is a main concern of system planners and operators, is frequency deviation limits and required spinning reserve to diminish it. In this paper, as a case study, technical criteria in Power evacuation system of IPP12 power plant to Salalah grid (DPC, Oman) are discussed.","PeriodicalId":127217,"journal":{"name":"2015 IEEE 8th GCC Conference & Exhibition","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-03-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE 8th GCC Conference & Exhibition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEEGCC.2015.7060080","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In each islanded grids, a number of technical rules and recommendations need to be followed in operation ensuring smooth operation of the system and to enable grid disturbances to be controlled. These technical rules and recommendations, however, give the operators the option of going beyond mere compliance with these minimum requirements, implementing more stringent requirements or even defining these in details. In this paper, main criteria and rules, which should be considered in interconnection power plants to the islanded grids, are reviewed. One of the criteria, that is a main concern of system planners and operators, is frequency deviation limits and required spinning reserve to diminish it. In this paper, as a case study, technical criteria in Power evacuation system of IPP12 power plant to Salalah grid (DPC, Oman) are discussed.
发电机组与孤岛电网互联的主要标准,Salalah IPP2案例研究
在每个孤岛电网中,在运行中需要遵循一些技术规则和建议,以确保系统的平稳运行,并使电网干扰得到控制。然而,这些技术规则和建议为运营商提供了超越这些最低要求的选择,实施更严格的要求,甚至详细定义这些要求。本文综述了电厂与孤岛电网并网时应考虑的主要准则和规则。其中一个标准,这是主要关注的系统规划者和运营商,是频率偏差限制和所需的旋转储备,以减少它。本文以阿曼萨拉拉电网(DPC, Oman Salalah)为例,探讨了IPP12电厂电力疏散系统的技术标准。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信