The Application of Closed-Loop Techniques to Engineering Project Planning

R. W. Haine, W. Lob
{"title":"The Application of Closed-Loop Techniques to Engineering Project Planning","authors":"R. W. Haine, W. Lob","doi":"10.1109/IRET-EM.1960.5007549","DOIUrl":null,"url":null,"abstract":"The techniques described in this paper to control research, development and engineering projects are adaptations of those developed and well-proven methods used for controlling manufacturing processes. To complete an engineering project to meet established specifications, within allotted funds and in the scheduled time, it is necessary to program the various phases and requirements of the project in great detail. The use of a project schedule chart as a formal tool of project management increases the project engineer's ability to quantitatively evaluate project status. Information about the progress made toward meeting the project goals can be used in a closed-loop system to initiate corrective action when there are deviations from scheduled plans. The project schedule chart as a basic source of information has other applications in the management of an engineering organization. For example, the tabulation of schedule chart data by means of punched cards facilitates rapid evaluation of the quantitative needs for manpower, funds and facilities within the organization. Evaluation of project performance through simplified analysis of project activity at all levels of management directs attention to ``problem'' projects. Data processing, including coding and tabulation of data, implements control of the projects, the project group, the system groups, the laboratories and the common support activities which, when taken altogether, make up an engineering department.","PeriodicalId":382847,"journal":{"name":"IRE Transactions on Engineering Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1960-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IRE Transactions on Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IRET-EM.1960.5007549","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

The techniques described in this paper to control research, development and engineering projects are adaptations of those developed and well-proven methods used for controlling manufacturing processes. To complete an engineering project to meet established specifications, within allotted funds and in the scheduled time, it is necessary to program the various phases and requirements of the project in great detail. The use of a project schedule chart as a formal tool of project management increases the project engineer's ability to quantitatively evaluate project status. Information about the progress made toward meeting the project goals can be used in a closed-loop system to initiate corrective action when there are deviations from scheduled plans. The project schedule chart as a basic source of information has other applications in the management of an engineering organization. For example, the tabulation of schedule chart data by means of punched cards facilitates rapid evaluation of the quantitative needs for manpower, funds and facilities within the organization. Evaluation of project performance through simplified analysis of project activity at all levels of management directs attention to ``problem'' projects. Data processing, including coding and tabulation of data, implements control of the projects, the project group, the system groups, the laboratories and the common support activities which, when taken altogether, make up an engineering department.
闭环技术在工程项目规划中的应用
本文描述的用于控制研究、开发和工程项目的技术是对那些用于控制制造过程的成熟和成熟方法的适应。为了在分配的资金和计划的时间内完成一个工程项目,以满足既定的规格,有必要对项目的各个阶段和要求进行非常详细的规划。使用项目进度表作为项目管理的正式工具,增加了项目工程师定量评估项目状态的能力。关于实现项目目标的进展的信息可以在闭环系统中使用,以便在偏离预定计划时启动纠正措施。项目进度表作为一种基本的信息来源,在工程组织的管理中还有其他的应用。例如,通过打孔卡片的方式对进度表数据进行制表,有助于快速评估组织内对人力、资金和设施的定量需求。通过对各级管理层的项目活动进行简化分析来评价项目绩效,将注意力引向“问题”项目。数据处理,包括数据编码和制表,实现对项目、项目组、系统组、实验室和共同支持活动的控制,这些活动加在一起,构成了一个工程部门。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信