Capacity assignment of the production lines with consideration of equilibrium requirement in iron & steel complex

Bo Zhang, Yang Yang
{"title":"Capacity assignment of the production lines with consideration of equilibrium requirement in iron & steel complex","authors":"Bo Zhang, Yang Yang","doi":"10.1109/ICSSE.2014.6887943","DOIUrl":null,"url":null,"abstract":"This paper concerns the production line capacity assignment problem with consideration of equilibrium requirement, which sources from the practical production management. The problem is to determine the utilized capacity of each production line in the iron & steel complex in order to make the load of each production line equilibrated and keep the logistics between production lines straightway. To tackle this problem, a mathematical programming model is formulated. Then the quadratic objective function is linearized to obtain a linear programming model which can be optimally solved by CPLEX. Finally, the experiment results based on real operational data have been done to illustrate the efficiency of the algorithm.","PeriodicalId":166215,"journal":{"name":"2014 IEEE International Conference on System Science and Engineering (ICSSE)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Conference on System Science and Engineering (ICSSE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSSE.2014.6887943","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This paper concerns the production line capacity assignment problem with consideration of equilibrium requirement, which sources from the practical production management. The problem is to determine the utilized capacity of each production line in the iron & steel complex in order to make the load of each production line equilibrated and keep the logistics between production lines straightway. To tackle this problem, a mathematical programming model is formulated. Then the quadratic objective function is linearized to obtain a linear programming model which can be optimally solved by CPLEX. Finally, the experiment results based on real operational data have been done to illustrate the efficiency of the algorithm.
考虑平衡要求的钢铁综合企业生产线产能分配
本文从生产管理的实际出发,研究了考虑均衡需求的生产线产能分配问题。问题是确定钢铁综合体中每条生产线的利用率,以使每条生产线的负荷平衡,并保持生产线之间的物流畅通。为了解决这个问题,建立了一个数学规划模型。然后对二次目标函数进行线性化处理,得到可通过CPLEX最优求解的线性规划模型。最后,给出了基于实际操作数据的实验结果,验证了算法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信