Jaime Hernán Aristizábal Ceballos, Julián Fernando Chaves Agudelo, Carlos Motta Tierradentro, M. I. Rodríguez
{"title":"Natech Risk Management on Pipelines of Cenit","authors":"Jaime Hernán Aristizábal Ceballos, Julián Fernando Chaves Agudelo, Carlos Motta Tierradentro, M. I. Rodríguez","doi":"10.1115/ipg2019-5342","DOIUrl":null,"url":null,"abstract":"\n In recent years, the Colombian government has strengthened its legislation moving towards a disaster risk management system (Law 1523 in 2012) and has established guidelines on the role of public and private entities (decree 2157 in 2017) when defining the structure of disaster risk management plans. This paper presents the advancements on Natech risk management implementation in Cenit (major Colombian pipeline operator of hydrocarbons transport), to identify areas of potential disaster based on the application of its geohazards assessment model that considers prevention specific elements and consequence analysis.","PeriodicalId":325632,"journal":{"name":"ASME-ARPEL 2019 International Pipeline Geotechnical Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASME-ARPEL 2019 International Pipeline Geotechnical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/ipg2019-5342","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In recent years, the Colombian government has strengthened its legislation moving towards a disaster risk management system (Law 1523 in 2012) and has established guidelines on the role of public and private entities (decree 2157 in 2017) when defining the structure of disaster risk management plans. This paper presents the advancements on Natech risk management implementation in Cenit (major Colombian pipeline operator of hydrocarbons transport), to identify areas of potential disaster based on the application of its geohazards assessment model that considers prevention specific elements and consequence analysis.