A study of resource constraint project scheduling problem for energy saving

T. Miyamoto, K. Mori, S. Kitamura, Y. Izui
{"title":"A study of resource constraint project scheduling problem for energy saving","authors":"T. Miyamoto, K. Mori, S. Kitamura, Y. Izui","doi":"10.1109/ICSSE.2014.6887897","DOIUrl":null,"url":null,"abstract":"In terms of energy consumption, the environment surrounding the manufacturing industries has become considerably strict. As a framework containing many production scheduling problems in manufacturing industries, a great deal of researches on the resource-constrained project scheduling problem (RCPSP) has been performed. We have proposed a RCPSP formulation called RCPSP/πRC, which can deal with realistic energy constraints such as power restriction during peak hours, contract demand, and energy consumption during the setup operations. In this paper, we evaluate RCPSP/πRC through computational experiments. The proposed method is compared with two heuristic rules. Results of computational experiments show the effectiveness of the proposed method.","PeriodicalId":166215,"journal":{"name":"2014 IEEE International Conference on System Science and Engineering (ICSSE)","volume":"66 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Conference on System Science and Engineering (ICSSE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSSE.2014.6887897","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

In terms of energy consumption, the environment surrounding the manufacturing industries has become considerably strict. As a framework containing many production scheduling problems in manufacturing industries, a great deal of researches on the resource-constrained project scheduling problem (RCPSP) has been performed. We have proposed a RCPSP formulation called RCPSP/πRC, which can deal with realistic energy constraints such as power restriction during peak hours, contract demand, and energy consumption during the setup operations. In this paper, we evaluate RCPSP/πRC through computational experiments. The proposed method is compared with two heuristic rules. Results of computational experiments show the effectiveness of the proposed method.
面向节能的资源约束项目调度问题研究
在能源消耗方面,制造业周围的环境已经变得相当严格。作为一个包含制造业生产调度问题的框架,资源约束型项目调度问题(RCPSP)得到了大量的研究。我们提出了RCPSP/πRC公式,该公式可以处理实际的能源约束,如高峰时段的电力限制、合同需求和安装过程中的能源消耗。本文通过计算实验对RCPSP/πRC进行了计算。并与两种启发式规则进行了比较。计算实验结果表明了该方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信