{"title":"Impacts of the Blackout on August 14 on the Renovation of Power Market in China","authors":"C. Wang, H. He, T. Zhu","doi":"10.1109/TDCLLM.2006.340721","DOIUrl":null,"url":null,"abstract":"The large-scale blackout of interconnected North America power grid occurred on Aug. 14, 2003 has not only resulted in very serious economic loss and social influence in America and Canada, but aroused a worldwide attention at the same time as well. Like the UK second electricity reform and American California electricity crisis, this blackout will provide significant references and experience for Chinese market-oriented power industry reform. This paper proposes the objective, conditions and process of the Chinese market-oriented reform. Then it emphatically researches the impacts of the Blackout on August 14 on the construction of power grids in China in the following aspects: the China nation-wide interconnection research, the monitoring of the power market, the electricity pricing, the establishment of a new reliability indices framework for bulk power system, etc","PeriodicalId":193517,"journal":{"name":"ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.2006.340721","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The large-scale blackout of interconnected North America power grid occurred on Aug. 14, 2003 has not only resulted in very serious economic loss and social influence in America and Canada, but aroused a worldwide attention at the same time as well. Like the UK second electricity reform and American California electricity crisis, this blackout will provide significant references and experience for Chinese market-oriented power industry reform. This paper proposes the objective, conditions and process of the Chinese market-oriented reform. Then it emphatically researches the impacts of the Blackout on August 14 on the construction of power grids in China in the following aspects: the China nation-wide interconnection research, the monitoring of the power market, the electricity pricing, the establishment of a new reliability indices framework for bulk power system, etc
8·14大停电对中国电力市场改革的影响
2003年8月14日发生的北美互联电网大规模停电事故,不仅在美国和加拿大造成了非常严重的经济损失和社会影响,同时也引起了全世界的关注。与英国第二次电力改革和美国加州电力危机一样,此次大停电事件将为中国市场化的电力行业改革提供重要的借鉴和经验。本文提出了中国市场化改革的目标、条件和过程。在此基础上,着重研究了“八一四”大停电对中国电网建设的影响,包括中国全国互联研究、电力市场监测、电价制定、大容量电力系统可靠性新指标框架的建立等方面
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信