B. Suhardi, Dwinda Asyfi Addina, Rahmaniyah Dwi Astuti
{"title":"IMPROVEMENT OF WORK TEMPERATURE AT CONTENT PRINTING WORKSTATION IN PUBLISHERS AND PRINTING CV GRAFIKA DUA TUJUH","authors":"B. Suhardi, Dwinda Asyfi Addina, Rahmaniyah Dwi Astuti","doi":"10.32890/JTOM2020.15.2.6","DOIUrl":null,"url":null,"abstract":"CV. Grafika Dua Tujuh is an industry engaged in publishing and printing books and student worksheets located in Klaten. The average output produced daily is 85.400 books and student worksheets, while the company has a production target of 90.000 books and student worksheets. Based on the results of interviews with workers, the level of production that is not maximal is caused by an uncomfortable working environment. Workers in the production room complained about the condition of a hot work environment so that workers feel easily tired and lack of concentration. To overcome the hot workplace, workers often go to the restroom and they work while holding the hand fan. This condition disturbed their concentration and cause work errors. If this condition is carried out continuously, there will be a lot of lost work time which can cause a decrease in productivity. This study aims to analyze the improvement of working temperature conditions in the production room of CV. Grafika Dua Tujuh. This research was conducted by directly measuring thermal conditions in the entire production room of CV. Grafika Dua Tujuh. Determination of the coordinate point of room temperature measurement is based on SNI: 16-7061-2004. Workload assessment is carried out based on SNI 7269: 2009. The results of the measurement of work climate at the content printing workstation are the values of air temperature, humidity, and wind speed i.e 33.32 °C, 39.9%, and 0 m/s. In addition, Wet Bulb Globe Temperature Index (WBGT) value is obtained which is on the verge of a limit, i.e 29.90 °C for the category of the heavy workload with an allocation of working time of 87.5%. The temperature is above the standard set by the Ministry of Health of the Republic of Indonesia No. 1405 / MENKES / 2002 which sets the temperature in an industrial room ranging from 18 °C - 28 °C. Improvement for working temperature is done by engineering control, namely the installation of a turbine ventilator or exhaust fan.","PeriodicalId":429639,"journal":{"name":"Journal of Technology and Operations Management","volume":"303 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Technology and Operations Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32890/JTOM2020.15.2.6","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
CV. Grafika Dua Tujuh is an industry engaged in publishing and printing books and student worksheets located in Klaten. The average output produced daily is 85.400 books and student worksheets, while the company has a production target of 90.000 books and student worksheets. Based on the results of interviews with workers, the level of production that is not maximal is caused by an uncomfortable working environment. Workers in the production room complained about the condition of a hot work environment so that workers feel easily tired and lack of concentration. To overcome the hot workplace, workers often go to the restroom and they work while holding the hand fan. This condition disturbed their concentration and cause work errors. If this condition is carried out continuously, there will be a lot of lost work time which can cause a decrease in productivity. This study aims to analyze the improvement of working temperature conditions in the production room of CV. Grafika Dua Tujuh. This research was conducted by directly measuring thermal conditions in the entire production room of CV. Grafika Dua Tujuh. Determination of the coordinate point of room temperature measurement is based on SNI: 16-7061-2004. Workload assessment is carried out based on SNI 7269: 2009. The results of the measurement of work climate at the content printing workstation are the values of air temperature, humidity, and wind speed i.e 33.32 °C, 39.9%, and 0 m/s. In addition, Wet Bulb Globe Temperature Index (WBGT) value is obtained which is on the verge of a limit, i.e 29.90 °C for the category of the heavy workload with an allocation of working time of 87.5%. The temperature is above the standard set by the Ministry of Health of the Republic of Indonesia No. 1405 / MENKES / 2002 which sets the temperature in an industrial room ranging from 18 °C - 28 °C. Improvement for working temperature is done by engineering control, namely the installation of a turbine ventilator or exhaust fan.
简历。Grafika Dua Tujuh是一家位于克拉滕的出版和印刷书籍和学生工作表的行业。每天的平均产量是85400本书籍和学生工作表,而公司的生产目标是90000本书籍和学生工作表。根据对工人的访谈结果,不是最大的生产水平是由不舒服的工作环境造成的。生产车间的工人抱怨工作环境太热,容易疲劳,注意力不集中。为了克服炎热的工作场所,工人们经常去洗手间,拿着风扇工作。这种情况干扰了他们的注意力,造成了工作失误。如果这种情况持续下去,将会有大量的工作时间损失,从而导致生产率下降。本研究旨在分析CV生产车间工作温度条件的改善。Grafika Dua Tujuh。本研究是通过直接测量CV整个生产车间的热条件进行的。Grafika Dua Tujuh。室温测量坐标点的确定基于SNI: 16-7061-2004。工作量评估是基于SNI 7269: 2009进行的。内容印刷工作站工作气候测量结果为空气温度、湿度、风速值,分别为33.32℃、39.9%、0 m/s。此外,得到的湿球温度指数(Wet Bulb global Temperature Index, WBGT)值接近极限,在工作时间分配为87.5%的大工作量类别中为29.90°C。温度高于印度尼西亚共和国卫生部第1405 / MENKES / 2002号规定的标准,该标准规定工业房间的温度范围为18°C - 28°C。工作温度的改善是通过工程控制来完成的,即安装透平通风机或排气扇。