A determining model on total investment, project life, and concession period interval for BOT projects

Haijun Bao, Hongdi Wang
{"title":"A determining model on total investment, project life, and concession period interval for BOT projects","authors":"Haijun Bao, Hongdi Wang","doi":"10.1109/ICCIT.2010.5711161","DOIUrl":null,"url":null,"abstract":"To properly determine the concession period is one of the most important questions of BOT (Build-Operate-Transfer) projects. Project life and total investment are always pre-given in extant models such as ACM and RCM, which needs more discussion. Social benefit is one crucial factor for a host government to accelerate infrastructure construction by the BOT mechanism, which has been much more concerned by scholars. In this article, a determining model on total investment, project life, and concession period interval for BOT projects has been established. We unlock the premise that total investment and project life are pre-given, and aim to maximize the total benefit of the host government including economic and social benefit while ensuring that the private enterprises will receive a certain profit, finally determining the ideal project life and total investment, hence obtaining the concession period interval. The determining model enables a better progress of the negotiation between the host government and private enterprises.","PeriodicalId":131337,"journal":{"name":"5th International Conference on Computer Sciences and Convergence Information Technology","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"5th International Conference on Computer Sciences and Convergence Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCIT.2010.5711161","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

To properly determine the concession period is one of the most important questions of BOT (Build-Operate-Transfer) projects. Project life and total investment are always pre-given in extant models such as ACM and RCM, which needs more discussion. Social benefit is one crucial factor for a host government to accelerate infrastructure construction by the BOT mechanism, which has been much more concerned by scholars. In this article, a determining model on total investment, project life, and concession period interval for BOT projects has been established. We unlock the premise that total investment and project life are pre-given, and aim to maximize the total benefit of the host government including economic and social benefit while ensuring that the private enterprises will receive a certain profit, finally determining the ideal project life and total investment, hence obtaining the concession period interval. The determining model enables a better progress of the negotiation between the host government and private enterprises.
BOT项目总投资、项目寿命和特许期限的确定模型
合理确定特许期限是建设-经营-转让(BOT)项目的重要问题之一。在ACM和RCM等现有模型中,项目寿命和总投资总是预先给定的,这需要更多的讨论。社会效益是东道国政府通过BOT机制加快基础设施建设的关键因素之一,受到学者们的广泛关注。本文建立了BOT项目总投资、项目寿命和特许期限的确定模型。我们解开总投资和项目寿命预先给定的前提,在保证民营企业获得一定利润的同时,以东道国政府包括经济效益和社会效益在内的总效益最大化为目标,最终确定理想的项目寿命和总投资,从而获得特许期限区间。确定模式使东道国政府与民营企业之间的谈判能够更好地进行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信