Service Contracts for Delays in Delivery

Amit Mitra
{"title":"Service Contracts for Delays in Delivery","authors":"Amit Mitra","doi":"10.1108/S1477-407020190000013008","DOIUrl":null,"url":null,"abstract":"The service industry is a major component of the economy. Raw material, components, assemblies, and finished products are shipped between suppliers, manufacturers, distributors, and retailers. Accordingly, timely receipt of shipped goods is crucial in maintaining the efficiency and effectiveness of such service processes. A service provider offers an incentive to the customer by specifying a competitive target time for delivery of goods. Further, if the delivery time is deviant from the target value, the provider offers to reimburse the customer for an amount that is proportional to the value of the goods and the degree of deviation from the target value. The service provider may set the price to be charged as a function of product value. This price is in addition to the operational costs of logistics that are not considered in the formulated model. For protection against deviation from target due dates, the service provider agrees to reimburse the customer. The reimbursement could be based on an asymmetric loss function influenced by the degree of deviation from the target due date as well as product value. The penalties could be different for early and late deliveries since the customer may experience different impact and consequences accordingly. The chapter develops a model to determine the amount (price) that the provider should add to the cost estimate of the delivery contract for protection against delivery deviations. Such a cost estimate will include the operational costs (fixed and variable) of the shipment, to which an amount is added to cover the expected payout to customers when the delivery time deviates from the target value. The optimal price should be such that the expected revenue will at least exceed the expected payout.","PeriodicalId":190722,"journal":{"name":"Advances in Business and Management Forecasting","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Business and Management Forecasting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/S1477-407020190000013008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The service industry is a major component of the economy. Raw material, components, assemblies, and finished products are shipped between suppliers, manufacturers, distributors, and retailers. Accordingly, timely receipt of shipped goods is crucial in maintaining the efficiency and effectiveness of such service processes. A service provider offers an incentive to the customer by specifying a competitive target time for delivery of goods. Further, if the delivery time is deviant from the target value, the provider offers to reimburse the customer for an amount that is proportional to the value of the goods and the degree of deviation from the target value. The service provider may set the price to be charged as a function of product value. This price is in addition to the operational costs of logistics that are not considered in the formulated model. For protection against deviation from target due dates, the service provider agrees to reimburse the customer. The reimbursement could be based on an asymmetric loss function influenced by the degree of deviation from the target due date as well as product value. The penalties could be different for early and late deliveries since the customer may experience different impact and consequences accordingly. The chapter develops a model to determine the amount (price) that the provider should add to the cost estimate of the delivery contract for protection against delivery deviations. Such a cost estimate will include the operational costs (fixed and variable) of the shipment, to which an amount is added to cover the expected payout to customers when the delivery time deviates from the target value. The optimal price should be such that the expected revenue will at least exceed the expected payout.
延迟交货服务合同
服务业是经济的重要组成部分。原材料、部件、组件和成品在供应商、制造商、分销商和零售商之间运输。因此,及时收到所运货物对于维持这种服务过程的效率和效力至关重要。服务提供商通过指定有竞争力的目标交货时间来激励客户。此外,如果交货时间偏离目标值,供应商将向客户提供与货物价值和偏离目标值的程度成比例的金额补偿。服务提供者可以根据产品价值的函数设定收费价格。这个价格是在制定的模型中没有考虑的物流运营成本之外的。为防止偏离目标到期日,服务提供商同意向客户报销。补偿可以基于一个不对称损失函数,该函数受偏离目标到期日的程度以及产品价值的影响。由于客户可能相应地经历不同的影响和后果,因此早交付和晚交付的惩罚可能不同。本章开发了一个模型,以确定提供商应在交付合同的成本估算中增加的金额(价格),以防止交付偏差。这样的成本估计将包括运输的运营成本(固定和可变),当交付时间偏离目标值时,将向客户增加一笔预期支出。最优价格应该使预期收益至少超过预期支出。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信