Examining the Performances of a Low Power Photovoltaic Installation

E. Spunei, I. Piroi, Florina Piroi, Gheorghe-Ștefan Mătăsaru
{"title":"Examining the Performances of a Low Power Photovoltaic Installation","authors":"E. Spunei, I. Piroi, Florina Piroi, Gheorghe-Ștefan Mătăsaru","doi":"10.1109/ATEE52255.2021.9425231","DOIUrl":null,"url":null,"abstract":"Low power photovoltaic installations must ensure the necessary energy level requirements of the installation’s beneficiary. At the same time, it must be conform to the legal regulations and norms. When a photovoltaic installation is to be delivered into the power supply network, its operating parameters must be closely monitored. In this work we present the results of our monitoring of a low power photovoltaic installation. Upon examination of the voltage variations, of the currents, of the voltage and current harmonics, we conclude that the installation we studied does indeed fulfill the necessary requirements for connecting to the national power grid. Examining the energy levels consumed by the beneficiary, we find that the photovoltaic installation cannot continuously ensure the required energy levels, which recommends the acquisition of an additional photovoltaic installation.","PeriodicalId":359645,"journal":{"name":"2021 12th International Symposium on Advanced Topics in Electrical Engineering (ATEE)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 12th International Symposium on Advanced Topics in Electrical Engineering (ATEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ATEE52255.2021.9425231","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Low power photovoltaic installations must ensure the necessary energy level requirements of the installation’s beneficiary. At the same time, it must be conform to the legal regulations and norms. When a photovoltaic installation is to be delivered into the power supply network, its operating parameters must be closely monitored. In this work we present the results of our monitoring of a low power photovoltaic installation. Upon examination of the voltage variations, of the currents, of the voltage and current harmonics, we conclude that the installation we studied does indeed fulfill the necessary requirements for connecting to the national power grid. Examining the energy levels consumed by the beneficiary, we find that the photovoltaic installation cannot continuously ensure the required energy levels, which recommends the acquisition of an additional photovoltaic installation.
低功率光伏装置的性能检验
低功率光伏装置必须保证装置受益者的必要能量水平要求。同时,它必须符合法律规定和规范。当光伏发电装置进入供电网络时,必须对其运行参数进行严密监控。在这项工作中,我们展示了我们对一个低功率光伏装置的监测结果。在检查了电压变化、电流、电压和电流谐波后,我们得出结论,我们研究的装置确实满足了连接到国家电网的必要要求。检查受益人消耗的能量水平,我们发现光伏装置不能持续保证所需的能量水平,建议购买额外的光伏装置。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信