Feasibility of using the gantt chart for the development of project documentation

Y. Novak, Y. Sobko, O. Sumariuk
{"title":"Feasibility of using the gantt chart for the development of project documentation","authors":"Y. Novak, Y. Sobko, O. Sumariuk","doi":"10.32347/2077-3455.2023.65.291-300","DOIUrl":null,"url":null,"abstract":"Gantt chart - considered an important part of project management, using the dates on the chart, you can accurately plan the delivery of materials, equipment, work of crews and subcontractors. The top level of the WBS is a project that represents the totality of the entire scope of work. The project consists of smaller works of different scope and importance, which are usually called work packages. The head of works often distributes work packages according to responsibility, assigning a responsible person to each package - an individual, a department, a subcontractor. In turn, each work package is subdivided into tasks or contains its own, smaller, internal work packages, the completion of which marks the end of work on the work package as a whole. Work on a work package is considered completed when the persons responsible for it (team) have completed all internal work packages and all tasks (events). \nA network diagram allows you to graphically establish the relationship between individual operations/work packages throughout the project area. The relationship and sequence between operations may vary from project to project, depending on the system you use in your work, the availability of funds, employees, etc. Actions are usually planned in a sequential order. Depending on the relationship between the beginning/end of previous and subsequent operations, four types of dependence are distinguished: \n \nfinish-start – a new operation begins immediately after the end of the previous one; \nstart-start – the start of the next operation is related to the start of the previous one, that is, in fact, two operations start at the same time; \nfinish-finish - the finish of the next one depends on and is connected with the end of the next one, that is, two operations are completed simultaneously; \nstart-finish – the beginning of the previous operation is connected with the end of the next one, that is, the finish of the next one is connected with the beginning of the previous one. \n \nWhen planning a relationship, you can enter lead time or delay time. The delay time creates a pause between the predecessor action and the successor action. \nThe Gantt chart is the most important tool for designers. The schedule allows you to plan and coordinate the work of teams, agree on the delivery dates of equipment and materials, monitor the actual performance of work with the planned, make corrections to the planned work if the project starts to fall behind the schedule or costs exceed the budget, in order to focus available resources on the performance of tasks that will allow fix problems and eliminate delays.","PeriodicalId":319540,"journal":{"name":"Current problems of architecture and urban planning","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Current problems of architecture and urban planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32347/2077-3455.2023.65.291-300","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Gantt chart - considered an important part of project management, using the dates on the chart, you can accurately plan the delivery of materials, equipment, work of crews and subcontractors. The top level of the WBS is a project that represents the totality of the entire scope of work. The project consists of smaller works of different scope and importance, which are usually called work packages. The head of works often distributes work packages according to responsibility, assigning a responsible person to each package - an individual, a department, a subcontractor. In turn, each work package is subdivided into tasks or contains its own, smaller, internal work packages, the completion of which marks the end of work on the work package as a whole. Work on a work package is considered completed when the persons responsible for it (team) have completed all internal work packages and all tasks (events). A network diagram allows you to graphically establish the relationship between individual operations/work packages throughout the project area. The relationship and sequence between operations may vary from project to project, depending on the system you use in your work, the availability of funds, employees, etc. Actions are usually planned in a sequential order. Depending on the relationship between the beginning/end of previous and subsequent operations, four types of dependence are distinguished: finish-start – a new operation begins immediately after the end of the previous one; start-start – the start of the next operation is related to the start of the previous one, that is, in fact, two operations start at the same time; finish-finish - the finish of the next one depends on and is connected with the end of the next one, that is, two operations are completed simultaneously; start-finish – the beginning of the previous operation is connected with the end of the next one, that is, the finish of the next one is connected with the beginning of the previous one. When planning a relationship, you can enter lead time or delay time. The delay time creates a pause between the predecessor action and the successor action. The Gantt chart is the most important tool for designers. The schedule allows you to plan and coordinate the work of teams, agree on the delivery dates of equipment and materials, monitor the actual performance of work with the planned, make corrections to the planned work if the project starts to fall behind the schedule or costs exceed the budget, in order to focus available resources on the performance of tasks that will allow fix problems and eliminate delays.
使用甘特图开发项目文档的可行性
甘特图-被认为是项目管理的重要组成部分,使用图表上的日期,您可以准确地计划材料,设备,工作人员和分包商的交付。WBS的顶层是一个项目,它代表了整个工作范围的总体。项目由不同范围和重要性的较小的工作组成,这些工作通常称为工作包。工程负责人经常根据职责分配工作包,为每个包指定负责人——个人、部门或分包商。反过来,每个工作包被细分为任务,或者包含它自己的、更小的、内部的工作包,这些工作包的完成标志着工作包作为一个整体的结束。当负责工作包的人员(团队)完成了所有内部工作包和所有任务(事件)时,工作包的工作就被认为完成了。网络图允许您在整个项目区域中以图形方式建立各个操作/工作包之间的关系。操作之间的关系和顺序可能因项目而异,这取决于您在工作中使用的系统、资金的可用性、员工等。行动通常是按顺序计划的。根据前一个操作和后续操作的开始/结束之间的关系,可以区分出四种类型的依赖:结束-开始-在前一个操作结束后立即开始一个新操作;start-start——下一个操作的开始与前一个操作的开始相关,即实际上两个操作同时开始;完成-完成——下一个操作的完成依赖于下一个操作的结束并与之相连,即两个操作同时完成;Start-finish -前一个操作的开始与下一个操作的结束相连,即下一个操作的结束与前一个操作的开始相连。在规划关系时,可以输入前置时间或延迟时间。延迟时间在前一个动作和后一个动作之间创建一个暂停。甘特图是设计师最重要的工具。计划允许您计划和协调团队的工作,商定设备和材料的交付日期,监控计划工作的实际表现,如果项目开始落后于计划或成本超过预算,则对计划工作进行纠正,以便将可用资源集中在可以解决问题和消除延迟的任务性能上。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信