The impacts of variability on scheduling approaches for a printed wiring board assembly operation

M. Pfund, Lian Yu, J. Fowler, M. Carlyle
{"title":"The impacts of variability on scheduling approaches for a printed wiring board assembly operation","authors":"M. Pfund, Lian Yu, J. Fowler, M. Carlyle","doi":"10.1142/S0960313102000242","DOIUrl":null,"url":null,"abstract":"Unrelated parallel machine scheduling problems have been well-studied for several single objective cases under deterministic processing conditions. While these problems are adequate for some manufacturing environments, there are situations where multiple objectives need to be considered. We report on a case for a Japanese printed wiring board manufacturer's drilling operation, which is measured on five key performance objectives and which is subject to processing time variability and random equipment breakdowns (usually in the form of jams). This research presents and evaluates an optimization approach against three dispatching heuristics to determine how these different scheduling approaches are impacted by processing time variability and equipment breakdowns and to determine which perform best under various levels of uncertainty.","PeriodicalId":309904,"journal":{"name":"Journal of Electronics Manufacturing","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2002-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Electronics Manufacturing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1142/S0960313102000242","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Unrelated parallel machine scheduling problems have been well-studied for several single objective cases under deterministic processing conditions. While these problems are adequate for some manufacturing environments, there are situations where multiple objectives need to be considered. We report on a case for a Japanese printed wiring board manufacturer's drilling operation, which is measured on five key performance objectives and which is subject to processing time variability and random equipment breakdowns (usually in the form of jams). This research presents and evaluates an optimization approach against three dispatching heuristics to determine how these different scheduling approaches are impacted by processing time variability and equipment breakdowns and to determine which perform best under various levels of uncertainty.
印刷配线板装配操作中,可变性对调度方法的影响
在确定性加工条件下,研究了几种单目标情况下的不相关并行机调度问题。虽然这些问题对于某些制造环境来说是足够的,但在某些情况下需要考虑多个目标。我们报告了一家日本印刷线路板制造商的钻井作业案例,该案例根据五个关键性能目标进行了测量,这些目标受加工时间变化和随机设备故障(通常以卡壳的形式)的影响。本研究提出并评估了一种针对三种调度启发式的优化方法,以确定这些不同的调度方法如何受到处理时间可变性和设备故障的影响,并确定哪种方法在各种不确定性水平下表现最佳。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信