{"title":"Determining System and Subsystem Availability Requirements: Resource Planning and Evaluation","authors":"C. C. Thompson, P. S. Hale, R. Arno","doi":"10.1109/ICPS.2007.4292104","DOIUrl":null,"url":null,"abstract":"When using an availability centered plan, a design develops that most appropriately matches the requirements of the facility, maximizing the effectiveness of resources. An availability centered plan serves to recognize subsystems that have specialized needs - needs that are unique from the remainder of the facility. In so doing, resources can be applied only where necessary, helping to optimize and prioritize the designs.","PeriodicalId":285052,"journal":{"name":"2007 IEEE/IAS Industrial & Commercial Power Systems Technical Conference","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-05-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE/IAS Industrial & Commercial Power Systems Technical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPS.2007.4292104","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
When using an availability centered plan, a design develops that most appropriately matches the requirements of the facility, maximizing the effectiveness of resources. An availability centered plan serves to recognize subsystems that have specialized needs - needs that are unique from the remainder of the facility. In so doing, resources can be applied only where necessary, helping to optimize and prioritize the designs.