{"title":"Combined interpretive structural modelling and expected value method approach for managing project risks in oil exploration project","authors":"D. Sarkar, S. Yadav","doi":"10.1504/IJDSRM.2013.057537","DOIUrl":null,"url":null,"abstract":"Oil exploration projects involve a large number of vulnerabilities and uncertainties associated with all project phases. This paper aims to develop a comprehensive framework for project risk management based on combined interpretive structural modelling (ISM) and expected value method (EVM) approach for oil exploration projects. ISM is useful in categorising the risks into different levels depending upon their severity and also in identifying the presence or absence of an interaction between risky activities. By EVM analysis, it is observed that the expected time overrun and expected cost overrun is about 15% and 20.08% more than the base time estimate (BTE) and base cost estimate (BCE) respectively. It is also observed that the probability of successful completion of the project within the scheduled contractual duration is only 10.75%. Thus, to ensure the probability of successful completion of the project, risk mitigation measures should be adopted accordingly.","PeriodicalId":170104,"journal":{"name":"International Journal of Decision Sciences, Risk and Management","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Decision Sciences, Risk and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJDSRM.2013.057537","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Oil exploration projects involve a large number of vulnerabilities and uncertainties associated with all project phases. This paper aims to develop a comprehensive framework for project risk management based on combined interpretive structural modelling (ISM) and expected value method (EVM) approach for oil exploration projects. ISM is useful in categorising the risks into different levels depending upon their severity and also in identifying the presence or absence of an interaction between risky activities. By EVM analysis, it is observed that the expected time overrun and expected cost overrun is about 15% and 20.08% more than the base time estimate (BTE) and base cost estimate (BCE) respectively. It is also observed that the probability of successful completion of the project within the scheduled contractual duration is only 10.75%. Thus, to ensure the probability of successful completion of the project, risk mitigation measures should be adopted accordingly.