{"title":"Review paper on wind power impact on operation of reserves","authors":"C. Hamon, L. Soder","doi":"10.1109/EEM.2011.5953136","DOIUrl":null,"url":null,"abstract":"This paper reviews studies concerning new challenges for European transmission system operators (TSOs) when operating primary, secondary and tertiary reserves in a system with large amounts of wind power. The review adopts three perspectives. First, the impact on existing markets is discussed and it is shown that need for additional reserve requirements does not necessarily mean need for new reserve capacity. Secondly, possible designs of improved load-frequency control schemes are presented. The proposed solutions exhibit a trend towards market-based procurement mechanisms and automation of reserve operations. Finally, participation of wind power in load-frequency control is examined. Technical designs are presented for participation in primary control.","PeriodicalId":143375,"journal":{"name":"2011 8th International Conference on the European Energy Market (EEM)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 8th International Conference on the European Energy Market (EEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2011.5953136","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

This paper reviews studies concerning new challenges for European transmission system operators (TSOs) when operating primary, secondary and tertiary reserves in a system with large amounts of wind power. The review adopts three perspectives. First, the impact on existing markets is discussed and it is shown that need for additional reserve requirements does not necessarily mean need for new reserve capacity. Secondly, possible designs of improved load-frequency control schemes are presented. The proposed solutions exhibit a trend towards market-based procurement mechanisms and automation of reserve operations. Finally, participation of wind power in load-frequency control is examined. Technical designs are presented for participation in primary control.
风电对储备运行影响的综述
本文综述了欧洲输电系统运营商(tso)在大量风电系统中运行一次、二次和三次储备时面临的新挑战。本报告采用了三种观点。首先,讨论了对现有市场的影响,并表明需要额外的准备金要求并不一定意味着需要新的储备能力。其次,提出了改进负载-频率控制方案的可能设计。拟议的解决办法显示出一种以市场为基础的采购机制和储备业务自动化的趋势。最后,考察了风电在负荷-频率控制中的参与情况。提出了参与初级控制的技术设计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信